Simulation Project Setup Status Torre Wenaus, BNL/CERN LCG Applications Area Manager http://cern.ch/lcg/peb/applications PEB Meeting January 28, 2003
2
Torre Wenaus, BNL/CERN PEB meeting, January 28, 2003 Slide 2 Simulation Project Mandated by SC2 in Dec to initiate simulation project, following the RTAG recommendations Discussions with experiments, G4, FLUKA, ROOT, … on organization and roles in progress Approach to organization is a single, large, broadly scoped project with several subprojects Keep the overall project leader job relatively thin Overall vision, organization, planning, communication, coherence, ‘politics’ Strong subproject leaders Direct technical leadership of activities Simulation subprojects larger in some cases than typical work packages in other projects, and with less horizontal coupling Some subprojects likely to be divided into work packages Scope and tentative subproject breakdown based on RTAG recommendations
3
Torre Wenaus, BNL/CERN PEB meeting, January 28, 2003 Slide 3 Tentative Subproject Breakdown (1) Generic simulation framework Multiple simulation engine support, geometry model, generator interface, MC truth, user actions, user interfaces, average ‘GEANE’ tracking, utilities ALICE virtual MC as starting point if it meets requirements With G4, the largest in terms of apps area development effort Geant4 development, integration, support, maintenance The CERN/LCG participation in G4 IT/API team moving to EP/SFT, plus participants from experiments Based directly on RTAG recommendations
4
Torre Wenaus, BNL/CERN PEB meeting, January 28, 2003 Slide 4 Tentative Subproject Breakdown (2) FLUKA integration CERN participation in FLUKA development proper not via the applications area This activity involves FLUKA integration with the generic simulation framework Anticipate using ALICE’s good connections to the FLUKA team to aid in this activity Physics validation The G4 validation program that originated in ATLAS and has since broadened, moves to this project Largely coordination and communication with efforts taking place within the experiments; not a large effort directly in this LCG project A team with active participants in each experiment Scope broader than G4, to simulation physics validation in general Including also simulation test and benchmark suite development
5
Torre Wenaus, BNL/CERN PEB meeting, January 28, 2003 Slide 5 Tentative Subproject Breakdown (3) Fast shower parameterisation Examine integration of GFLASH-like functionality into the simulation framework Model lateral and longitudinal shower profiles and deposit E spots based on profile and sampling fluctuations Allow fast parameterisation in calorimetry to coexist with detailed simulation elsewhere Generator services Follow recommendations of MC generator RTAG Generator librarian; common event files, validation/test suite; sw support, and development if needed (HEPMC, HepPDT) A simulation subproject, rather than a small project Oversight and direction from MC4LHC
6
Torre Wenaus, BNL/CERN PEB meeting, January 28, 2003 Slide 6 Personnel Very good candidates acceptable to the experiments and agreeable themselves identified for some subprojects Others require more discussion Probable that I will lead the overall project during a startup period, working with a slate of strong subproject leaders Possibly to be followed by adding overall leadership to a subproject leader’s job Or attracting to the job a good candidate unable to commit all of their time Hence the interest in keeping the top job relatively thin Two LCG participants currently active in simu will continue LCG-Russia interest in the generator services subproject CERN Geant4 team Most of the rest must come from experiments Work is obviously well suited to that
7
Torre Wenaus, BNL/CERN PEB meeting, January 28, 2003 Slide 7 Plan Discussions ongoing to complete definition of and agreement on the project organization identify candidate leaders and participants Initial ideas for generic simulation framework project being developed Expect to have the subproject breakdown settled and many subproject leaders in place circa mid-Feb Simulation project workplan due at SC2 Mar 14 I expect to make it