Barhale Quick Hitch Procedure Procedure, forms and information used when using quick hitches
2
Excavator Operator’s Declaration Form On arrival at site, and as part of the site induction, excavator operators are required to complete and sign a declaration to the effect that they have had the necessary training for the specific equipment that they will be using on site, including any non standard equipment such as: safe load indicators, quick hitch mechanisms, pile hammers / extractors, pole grabs and breakers in addition to standard excavation duties.
3
Excavator quick hitch attachment register The register is completed for every attachment change and includes; 360, 180 degree excavators and mini diggers. Where there is no attachment change in the course of the day, the register is signed on a daily basis to confirm that the driver has inspected the mechanism and that it is in good order. A key for the attachments is provided on the register for identification purposes. The person who is identified as having responsibility for plant on site will inspect the register at a maximum of seven days to ensure that the form is being used correctly.
4
Tool Box Talk Excavators (Quick Hitches and Lifting)
5
Barhale Procedure The Safe Use of Plant on Site