Download presentation
Presentation is loading. Please wait.
Published byLeonard Young Modified over 9 years ago
1
Modify guardrail ends to increase access width Action 1
2
Action 2 Trim vegetation to provide 6-foot wide and 10-foot high trail clearance wherever possible
3
Action 3 Coordinate with residents and Postal Service to relocate mailboxes out of path Coordinate with residents to relocate trash containers out of path
4
Action 4 Relocate signs to back of trail to increase available path width
5
Action 5 Remove wooden fence pieces to increase available path width
6
Action 6 Install 6-inch AC curb between path and roadway
7
Action 7 Construct 6-foot wide raised AC pathway
8
Action 8 Raise existing signs to provide 10-foot vertical clearance
9
Action 9 Realign lane striping westerly to increase clearance from trail on east side of PVDE
10
Action 10 Install actuated crossing with signals/flashing beacons and coordinated advance flashing beacons/signs at Headland Drive north
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.