Download presentation
Presentation is loading. Please wait.
Published byJohnathan Marshall Goodwin Modified over 9 years ago
1
Peter Kodyš, October 10, 2005, DEPFET workshop, Munich, Laser testy – status in Prague1 Peter Kodyš, Zdeněk Doležal, Pavel Řezníček, Zbyněk Drásal, Jan Brož, Pavel Bažant, Daniel Scheirich Progress in Silicon Detector Testing Setup in Prague Charles University
2
Peter Kodyš, October 10, 2005, DEPFET workshop, Munich, Laser testy – status in Prague2 Clean room: 1.ATLAS SCT module production finished 2.Cleaning and rearrangement of the clean room for general detector R&D 3.Installation of “black box” including: 1.Cooling system with monitoring in range +20 to -20 in chiller 2.Gas pipes (dry air, Nitrogen, other) 3.Environment monitoring: temperature, pressure 4.Microscope moved into the box 5.2D - position system moved in to box 4.New electronics in clean room: NIM and CAMAC modules (VME was there from production tests) 5.Installation of communication via GPIB protocol on PC
3
Peter Kodyš, October 10, 2005, DEPFET workshop, Munich, Laser testy – status in Prague3 Laser Tests: 1.2D motion system is installed and controlled from PC (step 5x10 m) 2.GPIB communication with oscilloscope is done to read special statistics and data to PC automatically 3.GPIB communication with generator is done to set laser pulse shape from PC automatically 4.All devices are controlled from ROOT environment 5.New 3D motion system was ordered (expected in November - 1x1x1 m precision) 6.Software for basic operations on laser tests is under development 7.Time setting of laser pulse with precision 1 ns and better 8.Simulations of laser in Si
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.