Download presentation
Presentation is loading. Please wait.
Published byRoy Johns Modified over 9 years ago
1
Stabilisation Working Group Feedback
2
Activities Workshop in August 2004 (30 attendees) –Identified problems –Identified work required to resolve the problems –Identified necessary research –Prioritized research needs
3
Activities Workshop in April 2005 (20 attendees) –Testing (highest priority) Working time Actual field construction temperatures –Suitability for use (also high priority) Develop database of proven performance
4
Testing Working time –Modified VicRoads method RC 330.02 Comparison of lab values with field conditions Actual air and soil temperatures Accelerated curing
5
Testing Four protocols –Determination of working time –Comparison of lab values with field conditions –Determination of soil and air temps –Accelerated curing Standard reporting format
6
Suitability To develop database from research very time consuming and expensive due to vast number of variables Develop database from pre-tender, current projects and as built data Generate questionnaire with standard format for reporting
7
Status Draft protocols and reporting format available for circulation committee. Draft questionnaire and reporting format available for circulation committee. Circulate to committee by end May Collate comments
8
Status Circulate to authorities with request that –questionnaire be given to consultants on pre-tender, current and recent projects for completion –where possible, testing to be carried out on current and future projects
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.