Summary of radiation shielding studies for MTA Muon production at the MiniBooNE target Igor Rakhno August 24, 2006
2
An accident scenario Prompt dose at normal operating conditions Groundwater contamination with tritium Residual activation Fermilab-TM-2248 (2004) Fermilab-TM-2305-AD (2005) http://www-ap.fnal.gov/users/rakhno/MuCool/
3
Plan View
5
Beam & Target Beam: 400-MeV protons; σ r = 1cm 2×10 14 p/s or 1.3 10 13 p/pulse at 15 Hz repetition rate Proton interaction lengths, λ (cm) Targets Target L (cm) R (cm)% of λ tot LH 2 21 10.5 2 Cu 1 10 10 LH 2 Al Cu λ tot 910 29 10 λ inel 1110 41 16
6
Spallation neutron studies → full absorption (≈100%) targets of heavy & dense materials (Pb, U nat ) are used. It is claimed that the facility can serve as a multi- purpose one for future operations. The 1-cm thick copper target (10% of interaction length) is considered as a generic (modest “averaged”) target.
7
Muons, Inc.
8
Accidental beam loss Deflection upward due malfunction of upstream magnets as high as 50 mrad (for 8-GeV proton beam accidents at Fermilab booster a deflection angle of about 1 mrad is usually considered). Duration of an accident ~ a few minutes. Calculated dose rate on the top of the berm = 0.016 mrem/s = 1 mrem/min = 60 mrem/hr.
9
Calculated dose rate on the top of the MTA berm at normal operation
10
Dose Equivalent in the Access Pit (normal operation) Lower Level Upper Level
11
Dose Equivalent in the Cryo Room (normal operation) 10´´ penetration 4´´ and 8´´ penetrations
12
Neutron Energy Spectra in the 10 ´´ Penetration Near target hall Near cryo room
13
Beam absorber and groundwater activation
15
Conclusions With the current beam absorber design the groundwater contamination with tritium does not exceed the EPA limits. The existing berm–10.5 ft soil–allows to run at rep.rates significantly lower than 15 Hz. It is a matter of choice/money – run at low intensity for a long time or build a local shielding and run at high intensity. Significant local shielding around the RF test cell (Muons, Inc.) is required to irradiate the cell at maximum beam intensity (rep.rate). Alternative – running at low rep. rate ~ 1 pulse/min. The penetrations between the target hall and the cryo room is a problem. Extra local shielding is required.
16
Muon production at the MiniBooNE target
18
Muon spectrum behind the absorber (at 54.5 m) 8-GeV protons on Be target @ 2.5×10 13 p/s In the range of 280-330 MeV ≈ 10 2 muon/cm 2 ·sec
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.