ETA Environmental Health and Safety Monthly Metrics February, 2016
2
ETA Accidents- 2/16 TypeDateDiv.DescriptionSeverityStatus No ETA accidents reported in February
3
ETA Accidents- By Type
4
ETA Accidents- Severity
5
ETA Emergency Incidents- 2/16 DateIncidentAreaStatus 2/19/16Strong “garlic” odor through most of building B70Odor investigation could not identify source. Continue to periodically monitor. 2/25/16Broken UV light bulbs inside equipment shipping crate 70-289Broken bulbs contain mercury. EHS assisted in removal of broken bulbs. 2/25/16Package of cobalt/lithium/managane se/nickel spilled at shipping/receiving area B69Shipping/receiving worker exposed. Building evacuated. Fire Department response. Follow-up with vendor on shipping practices.
6
ETA Ergonomic Assessments- By Month
7
Open ETA Ergonomic Assessments Date Requested Div.TypeStatus 2/2/16EAEIDiscomfortActions Pending 1/21/16EAEIDiscomfortActions Pending
8
ETA Incomplete Training Assignments *Does not include SEC0203 “External Notification”
9
Training % Completion Status
10
Incomplete Training by Course Type (Total Incomplete Assignments = 76 )
11
Training Assignments Due (Total = 76) Open Assignments by DivisionOpen Assignments by Hire Date
12
ETA Training Assignments Due
13
ETA Activity Manager Status (115 Total Work Activities)
14
ETA “Activity Manager” Assignments ETA Total Personnel- 723
15
Electrical Equipment Inspection Failure Status (Red Tag) Equipment listed in the EEIP database as “failed” and requires repair prior to use.
16
ETA Failed “Red Tag” Electrical Equipment Status (3/1/15) BarcodeBuildingRoomEquipment NameResponsible PersonDIV 4196170289PumpDestaillats, HugoEAEI
17
Electrical Equipment “Conditionally Accepted” Status (Yellow Tag) Equipment listed in the EEIP database as “Conditionally Accepted” and requires minor repair within 120 days.
18
ETA “Conditionally Accepted” Electrical Equipment Summary (3/1/16) Bar Code Bldg.RoomEquipmentResponsibleDivDays 4847170134Power Meter (LBNL Made)DelpEAEI810 4848131100ARefrigerator Test ChamberRosenquistEAEI727 4177964115SanderGoudeyBTUS677 4178164115Drill PressGoudeyBTUS677 4178464115Vertical Milling MachineGoudeyBTUS677 2889370299Precision RollerLiuESDR669 3892870173Stepping MotorTherkelsenBTUS668 3892970173Stepping MotorTherkelsenBTUS668 3893070173Stepping MotorTherkelsenBTUS668 3889770173Power SupplyTherkelsenBTUS446 5021970173Vacuum Pump AssemblyTherkelsenBTUS446 4196070289PumpDestaillatsEAEI318 5164962102Spot WelderTuckerESDR20 770970291Glove BoxCairnsESDR20
19
Corrective Action Reports (CATS)- 3/16 CAT #DateDescriptionLeadStatus 98818/31/15Ensure all glove boxes are NRTL approved or EEIP inspected. R. ScholtzSelf-assessment action item ORPS10/21/1570-295 pressure reactor explosion incident W. Wells/R. Scholtz/E. Cairns Formal LBNL incident investigation completed. Corrective Actions being developed by EHS.
20
Audits and Inspection Status- 2/16 TypeDateLeadStatus NFPA 45 Chemical Safety Assessment 5/16DOE/EHSBeing scheduled. EHS performing preliminary checks. Quarterly SAA4/16ScholtzBeing scheduled
21
Significant Safety Achievements- 2/16 An old sample/chemical clean-out was completed in the 70-201 lab area. Completed on the 62-316 furnace enclosure safety improvements. A Work Activity was approved for the new Cyclotron Spark Thermionics project in the 70-123 lab area. Work involves use of Cesium. Work Activities were developed for: –Parr Reactor use in 70-269 (collaboration) –Thermal Radiation research in 70-264 (approved) –ASM-200 Solvent Extraction System in 70-260 (approved) Safety Alerts were issued for: – Use of propane torches in lab areas. – Use of waste accumulation logs for solvent waste collection cans. Efforts continue in closing out “conditionally approved” and “failed” electrical equipment. Preparations for the Activity Manager self-assessment project have started. Meetings will be held with all ETA Activity Leads. An ETA Safety Committee meeting was held on 2/4/16.
22
Short Term Safety Outlook 3/16 Complete the Activity Manager Self Assessment project. Start the Nanomaterial Self Assessment project. Annual review and update of the ETA ISM Plan. Ensure lab areas are prepared for the upcoming NFPA 45 chemical safety assessment. Develop training materials for the new chemical spill cleanup kits. Continue to address all remaining ETA equipment on the electrical equipment “conditionally authorized” and “failed” lists. Assist with the glove box decontamination in 70-123. Complete review/update of Work Activity CY-0005 for Cyclotron Road work being performed at the Potter Street facility. Assist with establishing fall protection requirements for the “Cool Walls Exposure Rack” project located on the B50 roof. Perform a CMS inventory reconciliation in 70-201. A number of old “lecture bottle” gas cylinders are being scheduled for disposal.