Presentation is loading. Please wait.

Presentation is loading. Please wait.

WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.

Similar presentations


Presentation on theme: "WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting."— Presentation transcript:

1 WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, zhangyongjing@huawei.com Meeting Date: 2013-12-09 to 2013-12-13 Agenda Item: TP#8, Item 10, Reports from Working Groups

2 Issues for DECISION in TP Ready for approval: – oneM2M-TP-2013-0381R01, Approval of TR0006 (a.k.a. oneM2M-MAS-2013-0132-TR0006v0_5_1) © 2013 oneM2M Partners 2

3 Issues for DISCUSSION in TP Issue 1: Issue 2: © 2013 oneM2M Partners 3 N/A

4 Items for INFORMATION © 2013 oneM2M Partners 4

5 Highlights TR-0006: Management TR – Agreed contributions: oneM2M-MAS-2013-0132-TR0006v0_5_1 – Current status: Ready for APPORVAL (95%) – Milestones forecast: No change. © 2013 oneM2M Partners 5

6 Highlights TR-0007: Abstraction & Semantics TR – Agreed contributions: oneM2M-MAS-2013-0131R03-Ontology_Requirements – Output version: v0.5.0 – Current status: First draft (45%) – Milestone forecast: No change. © 2013 oneM2M Partners 6

7 Highlights TS-0001 Functional Architecture – Agreed (jointly with ARC) contributions: oneM2M-ARC-2013-0549R04mgmtObj_resource oneM2M-ARC-2013-0550R01mgmtObj-message-flow oneM2M-MAS-2013-0135R04mgmtCmd resource oneM2M-MAS-2013-0136R02mgmtCmd flows oneM2M-ARC-2013-0519R04Management Adapter Enhancements oneM2M-ARC-2013-0574R05nodeSpecific Resource Type oneM2M-ARC-2013-0594R05Application Resource Type oneM2M-ARC-2013-0518DMG CSF DM Lifecycle Updates oneM2M-ARC-2013-0568R06CSE Resource Description – Baseline Generalized management architecture DMG CSF & ASM CSF Dedicated management resources ( & ) & high level procedures Association with other resources (e.g.,, ) © 2013 oneM2M Partners 7

8 Open Issues © 2013 oneM2M Partners 8 N/A

9 Open Action Items © 2013 oneM2M Partners 9 Action Item Number Action Item DescriptionOwnerStatus A-WG5-7.0- 001 Contact BBF and OMA for joint Ad-hoc conf-call on the collaboration of DM Server Interaction. First topic will be on "Deployment Scenarios". Meeting notification will be sent to both WG4 & WG5 once the date is set. Tim Carey, ALU CLOSED A-WG5-7.0- 002 Resolve the editor’s notes regarding Management Architecture diagram in oneM2M-MAS-2013-0096R04 “DM Server Interaction” Tim Carey, ALU CLOSED A-WG5-7.0- 003 To identify and resolve editor’s notes and other editorial issues in TR-0006 for approval by TP#8. (Further contributions may be invited depending on the identified issues) Jiaxin Yin, Huawei CLOSED

10 Next Steps Progress TR-0007 (Abstraction & Semantics Study) – Further steps on semantics study can follow oneM2M-MAS-2013-0130 (see Annex). Progress TS-0001 (Functional Architecture) jointly with WG2 on Management Aspects. – Defining oneM2M-specific resources (e.g. software, battery, CMDH policy, CSE configuration, etc.). – Further input based on collaboration with OMA & BBF (see below) Collaboration with BBF & OMA on management aspects (by ad-hoc meetings) – Session (oneM2M-MAS-2013-0141R01) – Translation (oneM2M-MAS-2013-0140) Progress TS-0004 (Protocol) jointly with WG3 on Management Aspects. – Common protocol procedures and bindings Progress TS-0005 (OMA) & TS-0006 (BBF) – Skeletons – Technology-specific data model mapping and protocol procedures © 2013 oneM2M Partners 10

11 Next Meetings / Calls Conference Calls – oneM2M-BBF-OMA ad hoc #1: Wed, Jan 8th, 2014, UTC 13:00-15:00 – MAS#8.1: Mon, Jan 13th, 2014, UTC 13:00-15:00 – oneM2M-BBF-OMA ad hoc #2: Wed, Jan 15th, 2014, UTC 13:00-15:00 – MAS#8.2: Mon, Jan 20th, 2014, UTC 13:00-15:00 – oneM2M-BBF-OMA ad hoc #3: Mon, Jan 27th, 2014, UTC 13:00-15:00 – oneM2M-BBF-OMA ad hoc #4: Mon, Mar 24th, 2014, UTC 13:00- 15:00 Face-to-Face – MAS#9.0: February 17 - 21, 2014, Mobile, Alabama USA © 2013 oneM2M Partners 11

12 Annex Working assumption for semantic study TR:


Download ppt "WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting."

Similar presentations


Ads by Google