2 Problems Due To Obscene Of Site Investigation

3 Settlement Of Road

4 Cracks In Building

5 Tilting Of Tower

6 Types Of Settlement

7 Soil Exploration Program  for lightly loaded upto 2 storey building In already developed area- the existing local knowledge, records of trial pits and bore holes, behaviour of existing (similar) structure -sufficient.  For others- Planning an exploration program Preliminary investigation Detailed investigation-Soil exploration & sampling Penetration tests Bore log report - should be prepared

8 Planning An Exploration Program  Available information  Reconnaissance  Preliminary design data

9 Available Information  Arial photograph  Geologic map - State geological survey  Soil map of India  Topographical map  Soil survey section of the bureau of plants industry – agricultural year book  Hydrological data – area & waterway map of army engineers (river, MFL)  Soil manual of state highway

10

11

12

13

14

15 Reconnaissance  Inspection of the site  Topographical features Excavation, cutting Quarry, escarpment Water level in the well & stream Evidence of erosion on land slides  Existing structure (type, crack & settlement)  Photographs of site & adjacent structures

16 Preliminary Design Data  Building: Size, height of building & depth of basement Approximate arrangement of columns & bearing wall  Bridge Type & length of bridge Approximate vertical & horizontal loads

17 Preliminary Investigation  Walk over survey  Land survey  Data collection from offices/ deportments

18 Walk Over Survey

19  Carried out before land purchase with technical questionnaire survey sheet  technical questionnaire survey sheet Site address Description of site (open/ farm/ forest land) Site level (horizontal/ slopped) Is there any buried element (tree, old foundation) Is any newly filled area Adjacent building & cracks Site location development

20 Land Survey  Survey the site & establish property line  Outline the proposed building layout  Structure present on the plot if any  Record the surface observation  Water ponds, filled up area if any  Rail roads & highways  Overhead lines, towers

21 Data Collection From Offices/ Deportments  Swear lines  Water & gas mines  Air, water pipe line  Subway Tunnels  Telephone lines


Download ppt "SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU."