Utah State University O&M Request Higher Education Appropriations Subcommittee Stan L. Albrecht, President February 6, 2008
2
TWO PROJECTS: Student Athlete Academic Center Tooele Instruction Facility Utah State University O&M Request
3
Reason for request – Legislative intent language included in HB 328 of the 2004 session indicates that “the university may not request state funds for operations and maintenance.” Utah State University Student Athlete Academic Center
4
The scope of the project has changed Original project focused solely on athletics and associated needs Focus now includes academic space Utah State University Student Athlete Academic Center
5
Facility originally planned for two floors; now three Building an entirely different structure Lecture hall, student study areas, a computer classroom, offices for academic advisors Non-athletes will participate in the instruction that occurs in the facility Utah State University Student Athlete Academic Center
7
Academic Accomplishments of USU student athletes For the second year in a row, USU led the Fall Academic all-WAC selections USU leads all WAC institutions and peer institutions in graduation success rates, 77% Composite 3.05 student-athlete GPA 148 Whiteside scholar-athletes (3.2 or better GPA) Utah State University Student Athlete Academic Center
8
O&M Request: $78,700 Utah State University Student Athlete Academic Center
9
Facility was constructed by the City of Tooele USU lease with an option to buy Last year, the Legislature appropriated $900,000 to USU to pay the remaining debt and assume complete ownership We now lease some of the space to SLCC Utah State University Tooele Instruction Facility
10
In the policy brief narrative for USU, the Analyst mentioned this project as follows: “Utah State University had been making bond payments for the facility at the Tooele Regional Campus. During the 2006 General Session, the Legislature provided $900,000 to finish paying off the bond. USU is requesting funding for O&M for that facility, but the Analyst suggests that the funding no longer being used for the bond payments could be used for O&M.” Utah State University Tooele Instruction Facility
11
State building Funded in same way as other buildings Funds for instruction and program development will not be available Utah State University Tooele Instruction Facility
12
O&M Request: $92,300 Utah State University Tooele Instruction Facility