Download presentation
Presentation is loading. Please wait.
Published byAugusta Butler Modified over 8 years ago
1
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22 cm 2 Cell depth: 0.5 cm Total No. of channels: 169,344 Distance from vertex: 355cm Coverage: 2.3 – 3.5 Area of the detector: 1.8m 2 Ave. Occ: 13% for CPV & 28% for PMD Photon counting Efficiency: 64% & purity: 60% CPVPreShower
2
S. K. PalDCS WORKSHOP 17 JUN 2002 FEE Board Mounting and Cooling 4 chip MCM board with MANAS-16 (similar to that of station 3-4-5 of Dimuon Tracking) PMD Front-End Electronics
3
S. K. PalDCS WORKSHOP 17 JUN 2002
4
S. K. PalDCS WORKSHOP 17 JUN 2002 PMD Control System The Control System of PMD will consist of following subsystems: 1. High Voltage System 2. Gas System 3. FEE - Low Voltage System - Cooling System PMD Readout Chambers High Voltage Low Voltage Cooling Gas LV Crate HV Crate Temp. Flow FEE Air Flow
5
S. K. PalDCS WORKSHOP 17 JUN 2002 Schematic of LV Control System LV PS Distribution Box ‘N’ Power Supply Lines (Current ‘I’ in each Line) One Power Supply Line (Current ‘N*I’ in line) Control ‘On/Off’ FEE Read out Monitoring CAN Filed Bus ~50m No. of LV Chains : 180 Voltage : +/- 2.75V, +5V Current : 5A/Chain Model : PL500 from Wiener, 3U size Interlock : With cooling Alarms : depending on current limit / channel
6
S. K. PalDCS WORKSHOP 17 JUN 2002 Schematic of HV Control System HV PS Distribution Box ‘N’ Power Supply Lines (Current ‘I’ in each Line) One Power Supply Line (Current ‘N*I’ in line) Control ‘On/Off’ SM Monitoring CAN Filed Bus ~50m No. of HV Chains : 60 Voltage : - 2000V Current : 100 uA/Channel Model : ISEG or SY1527 Interlock : With Gas sub system Alarms : depends on currents/channel
7
S. K. PalDCS WORKSHOP 17 JUN 2002 PMD Cooling Setup to find out if Air Cooling is adequate for the PMD-FEE.
8
S. K. PalDCS WORKSHOP 17 JUN 2002 Effectiveness of forced air cooling can be seen here.
9
S. K. PalDCS WORKSHOP 17 JUN 2002 Gas ratio : Ar : Co 2 ( Ratio 70: 30) Monitoring : Required Interlock : With HV System Gas Sub System Cooling Sub System Alignment : - Few monitoring places Control Parameters : - Air flow - Temperature, 60 points wit pt100 Interlock and Alarms : - Interlock with LV Power supply System - Alarms if Temperature is not within limit
10
S. K. PalDCS WORKSHOP 17 JUN 2002 PMD Measures: Multiplicity and spatial distribution of photons on an event-by-event (E-by-E) basis Physics Goals: (1) E-by-E Multiplicity Fluctuation (2) Disoriented Chiral Condensates (3) Event shapes and Flow PMD Design: Recap from LHCC-2001: Pre-shower detector having fine granularity. PMD relocation from 580cm to 355cm – ITS & TPC services, Beam pipe, pump Necessitated smaller cell size ALICE PMD
11
S. K. PalDCS WORKSHOP 17 JUN 2002
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.