1 TG Quarterly Meeting Breckenridge, CO Apr 11, 2007 NCSA TG RP Update 1Q07

2 TG Quarterly Meeting Breckenridge, CO Apr 11, 2007 CSE-Online Science Gateway  Production Date: Mar 9, 2007  Developed under ITR program  DAC Community Allocation  MRAC Community Allocation just awarded  Dedicated 4 nodes on Mercury  Results from first 30 days (next slide) – Gaussian jobs running in restricted shell  Changing reservation to 1 node based on results, will continue to monitor usage

3 TG Quarterly Meeting Breckenridge, CO Apr 11, 2007 CSE Online Utilization Dedicated 4 nodes initially, now one node Goal: improved turnaround for a large number of small jobs submitted through the gateway.

4 TG Quarterly Meeting Breckenridge, CO Apr 11, 2007 LEAD Science Gateway  Supported Spring Weather Challenge (www.wxchallenge.com) forecasting contest for undergraduate atmospheric science studentswww.wxchallenge.com  Feb 19-26: daily testing, 80 processors, 12pm-5pm  Feb 26-April 27th: 160 processors; 12pm-5pm Monday through Thursday.  Actual contest submissions started week of March 26

5 TG Quarterly Meeting Breckenridge, CO Apr 11, 2007 LEAD Gateway Statistics  250 jobs per week, consuming 1800 SUs/week  Each workflow is 5 jobs –  250 jobs corresponds to 50 workflows  Expect this to increase once issues are resolved/reliability improves  LEAD Gateway typically the most or 2 nd most active gateway in terms of resources used  (BIRN or GridChem are often ahead)

6 TG Quarterly Meeting Breckenridge, CO Apr 11, 2007 Issues Uncovered by both Science Gateways  Remote job submission – great when jobs run – hard to know problems – even simple things such as planned downtime  Reservation Issues – can’t overflow end of reservation when many jobs stack up (LEAD)  If user assigns an obsolete project, don’t get useful error message back  GridFTP striped server – one fails, all fail

7 TG Quarterly Meeting Breckenridge, CO Apr 11, 2007 SG Next Steps  Meetings with teams to understand usage modes and issues  CSE Online NCSA contingent visiting CSE Online group at Univ of Utah Apr 23 – 25  LEAD NCSA and IU RP’s setting up a date to visit LEAD group at IU

8 TG Quarterly Meeting Breckenridge, CO Apr 11, 2007 New Resource - Abe  Abe: 1955 blade cluster  2.33 GHz Cloverton Quad-Core 1,200 blades/9,600 cores 89.5 TF; 9.6 TB RAM; 120 TB disk Perceus management; diskless boot  Cisco Infiniband 2 to 1 oversubscribed  Lustre over IB 8.4GB/s sustained  Power/Cooling 500 KW / 140 tons  TG Software deployment CTSS Inca  Production date: May 2007 (anticipated)  User Environment Torque/Moab Softenv Intel Compiler MPI: evaluating Intel MPI, MPICH, MVAPICH, VMI-2, etc.

9 TG Quarterly Meeting Breckenridge, CO Apr 11, 2007 March Allocations  25.1 M SUs (672M NUs) awarded to NCSA systems  34% of allocated resources  Several large supplements coming in after the meeting  Several 1M+ SU allocations @ NCSA  Silas Beane: 2.0M on Tungsten  Ali Uzun: 2.0M on Abe  Adrian Roitberg: 1.5M on Abe  Thom Cheatham: 1.0M on Abe