1 Temporary Construction Staging Area Licensing Agreement for Peabody Hotel April 1, 2008 Orange County Convention Center
2
2 Peabody Hotel Expansion Rendering
3
3
4
4
5
5 Orange County Convention Center Land Swap Proposal March 2000
6
6 Purpose To conduct a series of land swaps that enable the existing and Phase V convention facilities to be located in close proximity
7
7 Benefits Contiguous exhibit space was an overriding desire of OCCC potential users who were surveyed
8
8 Benefits Creates a contiguous convention and tradeshow campus
9
9 Benefits Helps solve transportation issues by connecting existing and new building and parking facilities
10
10 Benefits Reduces pedestrian connector construction costs by $3 million, 270 feet
11
11 Benefits Provides for an additional ~300,000 SF of buildable area on the east end of Phase V
12
12 How do we accomplish this plan?
13
13 Current Phase V Site Phase V & VI Universal Information Center
14
14 No Swap Master Plan Peabody Expansion Area
15
15 Proposed Swap Master Plan
16
16 Proposed Swaps 1.Peabody Hotel 2.Universal Information Center 3.Loop Road Connector Right-of-Way and Temporary Easements
17
17 1. Peabody Swap A C B
18
18 1. Peabody Swap 0.489 Acres of Land “A” (Blue Triangle) Pedestrian Connector Easement Through Peabody Site “B” of 0.829 acres $40 per Space per Month Parking Rent (Indexed with Inflation) OCCC Receives
19
19 0.489 Acres of Air Right “C” (Red Square) 550 Unspecified Peabody Employee Parking Spaces (Surface or Structure) Temporary Construction Staging Area OCCC Gives 1. Peabody Swap
20
20 No Swap Master Plan Peabody Expansion Area
21
21 Proposed Swap Master Plan
22
22
23
23
24
24 Action Requested Approval of License Agreement to the Peabody Hotel for a three-acre Staging Area
25
25 2. Universal Center Swap A B A = B 1.1 = 1.1 Acres Acres
26
26 2. Universal Information Center Swap 1.1 Acres of Land “A” Ability to Add Intersection Turn Lanes OCCC Receives 1.1 Acres of Land “B” OCCC Gives
27
27 A B 3. Loop Road Connector Swap A=5.136 B=5.136 C=.415 Acres Acres
28
28 Temporary Easements B D
29
29 3. Loop Road Connector Swap 5.136 Acres of Land “B” 0.415 Acres of Land “C” .092 Acres of Temporary Easement “D” OCCC Receives 5.136 Acres of Land “A” OCCC Gives
30
30 Proposed Swap Master Plan
31
31 Requested Action: Approval of Contracts 1.Peabody Hotel Swap 2.Universal Information Center Swap 3.Loop Road Connector Right-of-Way Swap and Temporary Easements
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.