1 Status Update Date: February 8, 2011 Group: CubeSat Deorbit Device Members:Jake Tynis Joshua Laub Lindsey Andrews

2 Previous work Performed lab test to examine different folding techniques and frontal surface area when inflated Downloaded STK software and became more familiar with the program’s capabilities

3

4 Previous work (cont’d) Budget Added details to budget for different designs (space-qualified and lab alternate)

5 Previous work (cont’d) Constructed mock-up device container Materials: – Obtained quotes on aluminum from suppliers – Got in touch with Wacker Chemie AG, manufacturer of Elastosil S 36 – Approached DuPont about Suva 236fa – Contacted ASCO for quote on micro solenoid valve

6 Current Work Interfacing with Wacker Chemie to find a suitable alternative to Elastosil S 36 Still working with DuPont (slow to respond) Writing budget proposal Preparing to meet with NASA to discuss exploration of different materials Gathering information about a lab set-up using micro solenoid valve with labview

7 Planned work Short-Term: – Meet with NASA materials group – Finish and send out budget proposal – Continue looking into valve actuator of deorbit device Long-Term – Order materials – Investigate electronic initiation of lid opening – Build lab-setup with actuator capability