Presentation is loading. Please wait.

Presentation is loading. Please wait.

Team 6 The Calvin Drain Trust Mike DeWeerd, Matt Schanck, Aaron Venema, Kat Wever 1/10.

Similar presentations


Presentation on theme: "Team 6 The Calvin Drain Trust Mike DeWeerd, Matt Schanck, Aaron Venema, Kat Wever 1/10."— Presentation transcript:

1 Team 6 The Calvin Drain Trust Mike DeWeerd, Matt Schanck, Aaron Venema, Kat Wever 1/10

2 Who Are We? Management Mike Modeling Matt Web Master AaronResearcher Kat Group Project Description Design Norms Current 2/10

3 Customer  Geoff Van Berkel (Physical Plant)  Calvin College Group Project Description Design Norms Current calvin.edu 3/10

4 Problem  Run-Off on Calvin’s Campus to City of Grand Rapids  KE  EB Parking Lot  Not Enough Irrigation Water Group Project Description Design Norms Current theroadgetslongerifistop.com 4/10

5 Project Objectives  Reduce Run-Off on Calvin’s Campus  Re-Use Run-Off as Irrigation Group Project Description Design Norms Current finditak.com 5/10

6 Design Options  Create Detention Pond with Drain to Irrigation  Underground Storage  Stormwater Chamber  Using North Pond for Irrigation Group Project Description Design Norms Current 6/10

7 Potential Obstacles  Finding a Location for the Detention Pond  Pollutants/Water Quality Group Project Description Design Norms Current socofarm.com 7/10

8 Design Norms  Stewardship  Transparency  Caring Group Project Description Design Norms Current hort.ifas.ufl.edu 8/10

9 Current  Research  Visiting Sites with Similar Systems Group Project Description Design Norms Current woodtv8.com 9/10

10 Questions? 10/10


Download ppt "Team 6 The Calvin Drain Trust Mike DeWeerd, Matt Schanck, Aaron Venema, Kat Wever 1/10."

Similar presentations


Ads by Google