Download presentation
Presentation is loading. Please wait.
Published byNorman Gallagher Modified over 8 years ago
1
HEADER / FOOTER INFORMATION (SUCH AS NORTHROP GRUMMAN PRIVATE / PROPRIETARY LEVEL I) 20 May 2009 Bob Davis Space Transportation Operations Working Group
2
2 Establishing Priorities for STOWG WG Tasking Process Review DoD Commercial Launch Issues Tasker – Discuss, Initiate Discuss the Charter and Bounds of “Operations” –Definition of “System” –Expendable Launch Systems –Reusable Launch Systems Develop top 2-3 STOWG Issues for Recommendation to FAA-AST priorities –Forward to AST for consideration –Further develop for October 2009 WG Meeting –COMSTAC then recommend priorities to DOT/FAA
3
3 STOWG - Ops Further breakdown operations into –RTL on a runway –RTL via parachute
4
4 DoD Does study apply to commercial launches conducted from space ports on state land? Use of restricted airspace for other than research activities
5
5 STOWG Summary – May 2009 DoD Commercial Launch Challenges Tasker Plan Other Discussion Topics / Actions
6
6 System Definition Discussion Spaceport 1 Spaceport 2 FL 600 EndoAtmospheric ExoAtmospheric FAA/ICAO Airspace Mgmt Protocols FAA/ICAO Airspace Mgmt Protocols Reflown System Reflown System Expended / Expended + Reflown Systems Reflown Systems Key Question – Where Does “Vehicle/Vehicle Development” End & “Ops” Begin?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.