PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone 22 th November 2012 LIU-PSB.

Similar presentations


Presentation on theme: "PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone 22 th November 2012 LIU-PSB."— Presentation transcript:

1 PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone 22 th November 2012 LIU-PSB

2 Pump BT-VPI23A passage BT-BHZ 10

3 BTM- BHZ 10 BTY-BVT 101 EQUIPMENT TO BE DISMANTLED DUMP

4 EQUIPMENT TO BE DISMANTLED Elements to be disposed of and replacedEquipment to be temporarily dismantled

5 STRATEGY: STEPS ‘Plug’ against radiation

6 STRATEGY: STEPS Blocking system ‘Plug’ against radiation Clamping tool

7 Clamping system to pull the old beam pipe + dump core

8 STRATEGY: STEPS SawContainer dump Container beam pipe Frame and adjustable support for winch Blocking system ‘Plug’ against radiation Clamping tool

9 System to cut the beam pipe

10 System to pull the beam pipe-dump core assembly: winch

11 The necessary equipment will be brought through the shaft by crane Length: 2.6m to 2.9m Width: 1.5m SWL PR: 10t

12 BACK-UP

13 Most outer shielding block must be blocked

14 Shielded container for dump core

15 Lifting support

16 Adjustable height table

17