PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone 22 th November 2012 LIU-PSB
2
Pump BT-VPI23A passage BT-BHZ 10
3
BTM- BHZ 10 BTY-BVT 101 EQUIPMENT TO BE DISMANTLED DUMP
4
EQUIPMENT TO BE DISMANTLED Elements to be disposed of and replacedEquipment to be temporarily dismantled
5
STRATEGY: STEPS ‘Plug’ against radiation
6
STRATEGY: STEPS Blocking system ‘Plug’ against radiation Clamping tool
7
Clamping system to pull the old beam pipe + dump core
8
STRATEGY: STEPS SawContainer dump Container beam pipe Frame and adjustable support for winch Blocking system ‘Plug’ against radiation Clamping tool
9
System to cut the beam pipe
10
System to pull the beam pipe-dump core assembly: winch
11
The necessary equipment will be brought through the shaft by crane Length: 2.6m to 2.9m Width: 1.5m SWL PR: 10t
12
BACK-UP
13
Most outer shielding block must be blocked
14
Shielded container for dump core
15
Lifting support
16
Adjustable height table