Graeme Cox BEng (Ag) PhD Dave Cox Farmer By
2
optisurface.com Evolution of Landforming We have been landforming since agriculture began
3
optisurface.com Evolution of Landforming –1900s Dumpy & Stakes –1970s Laserplane –1990s Multiplane –2000s OptiSurface* *Patent Pending
4
optisurface.com Benefits of Landforming Higher Yields, Quality and Profit through Minimised water logging Improve infiltration uniformity Sooner trafficability Improved crop establishment Improved uniformity of crop maturity Reduced weed problems
5
optisurface.com OptiSurface Landforming MUCH BETTER!! …provides all of the benefits of traditional laser landforming only: Much cheaper (up to 80%) Much less topsoil removal Much faster
6
optisurface.com Case Study C7 Block: C7 Area: 92 Ha Location: DAVCO Farming, Burdekin Row Cropping (sugar cane) Lateral Move Irrigation
7
optisurface.com Existing Topography C7 Note: vertical scale exaggerated x 100
8
optisurface.com Plane of Best Fit C7
9
optisurface.com Plane of Best Fit - Cut\Fill Map Cut: 791m 3 /ha Cost: $1,190/ha Max Cut: 0.350m C7
10
optisurface.com OptiSurface Design Constraints Minimum Downslope: 1:9000.111% Maximum Downslope: 1:3000.333% Max. Downslope change: 1:40000.025% Minimum Cross-slope: 1:-200-0.500% Maximum Cross-slope: 1:2000.500% Max. Cross-slope change: 1:10000.100%
11
optisurface.com OptiSurface Design C7
12
optisurface.com OptiSurface - Cut\Fill Map Cut: 180m 3 /ha Cost: $270/ha Max Cut: 0.270m C7
13
optisurface.com Long Section Plot Long section plot C7 Downslope: 0.111% to 0.333%
14
optisurface.com Long Section Plot C7 Downslope: 0.050% to 1.000%
15
optisurface.com OptiSurface - Downslope Map C7
16
optisurface.com Runoff Velocity Map FLOW DIRECTION C7 Rainfall: 75mm/hr Max Velocity: 0.44m/s
17
optisurface.com Runoff Depth Map C7 Rainfall: 75mm/hr Infiltration:0mm Max Depth: 0.170m FLOW DIRECTION
18
optisurface.com OptiSurface - Downslope Map C7
19
optisurface.com Design Surface Options –OptiSurface 1D Row drainage in one direction only –OptiSurface 2D Row drainage in two directions –OptiSurface 4D Can drain in any direction as long as it leaves the field
20
optisurface.com Case Study C8 – Existing C8 LS1 LS2
21
optisurface.com OptiSurface 2D Design C8 LS1 LS2
22
optisurface.com Long Section 1 C8
23
optisurface.com Long Section 2 C8
24
optisurface.com OptiSurface 4D Design C8
25
optisurface.com OptiSurface 4D Existing C8
26
optisurface.com Mass Haul Optimisation –Optimise for haul distance –Reduce cost by up to 70% –Mass haul value allows for more accurate earthmoving quotes
27
optisurface.com OptiSurface - Cut\Fill Map Cut: 95m 3 /ha Cost: $200/ha Max Cut: 0.163m B8&B9
28
optisurface.com Mass Haul Optimisation IterationCut (m 3 /ha) Mass Haul (m 3.m) 0922.1 million 1921.4 million 2950.7 million 3971.0 million
29
optisurface.com Contact Us: Contact us for a FREE Design Phone: +61 7 4782 7575 (international) (07) 47827575 (Australia) Email: design@optisurface.comdesign@optisurface.com Visit: www.optisurface.comwww.optisurface.com