The Project Concept Phase - Concept Report Requirements Presented by the Georgia Department of Transportation Roxana Ene – LCI Coordinator

Similar presentations


Presentation on theme: "The Project Concept Phase - Concept Report Requirements Presented by the Georgia Department of Transportation Roxana Ene – LCI Coordinator"— Presentation transcript:

1 The Project Concept Phase - Concept Report Requirements Presented by the Georgia Department of Transportation Roxana Ene – LCI Coordinator Email: Roxana.Ene@dot.state.ga.usRoxana.Ene@dot.state.ga.us Phone: 404-651-5326 May 2, 2007

2 The Concept Phase Objective To define the critical elements of an LCI project that will appropriately address the identified Need and Purpose. To develop a Concept Report that will describe the project “foot print”.

3 Concept Team Meeting Purpose: Better understanding of project scope, identification of what is needed and when and the next steps Held by: The Sponsor Attended by: Project manager(s), Utilities reps, GDOT Area Engineer (if State Route affected)

4 Public Meeting Purpose: Provide information on the project Allow for public input Develop understanding and support for the project

5 The Concept Report Critical document that forms the foundation of every LCI project The quality and accuracy of the document could improve the timing for the next steps

6 The Concept Report - Important elements Project Need and Purpose – clearly state the need and purpose of the project. Project Concept/Description – the description should elaborate the details of the project such as features and elements to be constructed, but should match ARC’s description.

7 The Concept Report - Important elements Existing Design Features – typical section, right-of-way, traffic and accident data Proposed Design Features – typical section, right-of-way, any features that may require a Design Variance Environmental concerns/level of analysis Utilities involvement – what will be required to be relocated Other projects in the area Schedule – responsible parties and timing

8 The Concept Report - Important elements Attachments: Cost Estimate Project Location Map Typical Sections Minutes from the concept meeting Summary of comments from the PMs

9 Review Questions!


Download ppt "The Project Concept Phase - Concept Report Requirements Presented by the Georgia Department of Transportation Roxana Ene – LCI Coordinator"

Similar presentations


Ads by Google