Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 10, 2008.

Similar presentations


Presentation on theme: "Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 10, 2008."— Presentation transcript:

1 Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 10, 2008

2 Previous Week’s Action Item #1 -Calibration of Speed/Turning of Vehicle - Unable to do so (motors had not been mounted) - Changed plan: -Created user interface including keypad commands and LCD menu options. -Programmed function to determine vehicle location.

3 User Interface 1. Locate2. Operate 3. Traverse4. Search 1. Hazard Location 2. Starting Location 2. Operate: Full traverse and search algorithm (project goal) 3. Traverse: Traverse field only 4. Search: Perform search algorithm only

4 Determining Location Sample GPS Receiver 5 or more satellites in view? 30 samples taken? Average coordinates and store to memory Yes No Record Coordinates

5 Previous Week’s Action Item #2 -Documentation - Completed abstract, executive summary, and website -Website contains documentation, virtual model, design reviews, and much more http://www.nd.edu/~me463a38

6 Current Status of Concept - CAD model complete - Physical prototype essentially complete - Working on electrical components and software - Schedule Status: Behind Schedule -Wanted vehicle moving by now Solution: Lots of work these next few days, focusing on completion of individual design requirements - Showstoppers: None Currently (but still suffering from previous week’s showstopper)

7 CAD Model Full Model

8 CAD Model Exploded Drive System

9 Physical Prototype Vehicle Drive System

10 Next Week’s Action Items - Electrical Component Preparation for Display -Hazard Sensing -Driving Straight -Turning -Autonomous Control - Development of Vehicle Operation Code -Integrate GPS function and navigation -Perform each function (locating, driving, turning, sensing)

11 Operation Flow Chart

12 Thank you.