Presentation is loading. Please wait.

Presentation is loading. Please wait.

Engineering John DeHart and Jon Turner Applied Research Lab, Washington University www.arl.wustl.edu/~jdd SPP Deployment Plan.

Similar presentations


Presentation on theme: "Engineering John DeHart and Jon Turner Applied Research Lab, Washington University www.arl.wustl.edu/~jdd SPP Deployment Plan."— Presentation transcript:

1 Engineering John DeHart and Jon Turner Applied Research Lab, Washington University www.arl.wustl.edu/~jdd SPP Deployment Plan

2 2 Engineering SPP Deployment Locations SALT Lake City KANSas City WASHin gton DC HOUSton ATLAnta planned extension to initial deployment 1 GbE connections 1 2 3 4 1 2 3 4 1 2 3 4 4 3 2 1 4 3 2 1 5 6 5 5

3 3 Engineering SALT Configuration Router (I2) 10Gb/s 1 Gb/s each 1 Gb/s each 10Gb/s SPP Optical Network 12341234 GbE Switch (Proto- GENI) 8 9 10 LC ports copper connections private IP addresses public IP addresses connection to CP (10/100) public IP GbE Switch (I2)

4 4 Engineering WASH Configuration (same as SALT) Router (I2) 10Gb/s 1 Gb/s each 1 Gb/s each 10Gb/s SPP Optical Network 12341234 GbE Switch (Proto- GENI) 8 9 10 private IP addresses public IP addresses connection to CP (10/100) public IP GbE Switch (I2) LC ports copper connections

5 5 Engineering KANS Configuration Router (I2) 10Gb/s 1 Gb/s each 1 Gb/s each 10Gb/s GbE Switch (Proto- GENI) private IP addresses public IP addresses connection to CP (10/100) public IP GbE Switch (I2) SPP 123456123456 8 9 10 Optical Network LC ports copper connections

6 6 Engineering 3 Month Priorities Deployment by July 1. »ProtoGENI folks are deploying at same time. Configure for Deployment and Exercise »Rename three nodes (John and Dave) »Configure exactly as will be when deployed (John and Dave) »Code option for Games Application (Ritun) Without taking up much if any of John or Fred’s time. »In Progress : Other people using SPPs (Ken, Ritun) »Re-do SPP3: hub and GPE boot sequence (Dave) »Boot sequence (srm, scd, rmp, natd, …) (John and Fred) »Sharing things like sliced, SPPMon, etc. Should they go in the ref. file system give to each slice? (John) Bug Fixes »DONE: Filter API calls (Mart) »Flow Control (Dave) (but not necessarily for July 1) »DONE: NM/RMP timing (John and Fred) »DONE: Verify removing a slice cleans up correctly (John) »DONE: First ICMP NAT connection fails. NAT initialization file had ICMP start ID of 0, should be 1. (John, Mart) In Progress: Reservations (Fred) Security Holes (Fred) In Progress: Flowstats (John) »In Progress: FSD »DONE: SCD »SRM »NATD »DONE: Updates to ME FlowStats: add TimeRecord, add Command to FlowRecord and TimeRecord Change SubstrateOnly Lookup to NPE Bypass Lookup (John) Power Control for remote reboot capability (Dave) Documentation (Ken) Plan for software upgrades and version control (John) Detailed installation instructions and diagram (Dave) SPP PLC: Any changes needed? Open up to outside WU. »EIT doing backups of SPP PLC »PLC Admin email for new user requests

7 7 Engineering Not Priorities NPE V2 »Mike can keep working on it but should not distract the rest of us. GEC-5 (mid-July) Demo Geniwrapper and RSPecs »Its not ready for us anyway… Openflow code option and demonstration »Nick McKeown wants to hold off until GEC-6 also.


Download ppt "Engineering John DeHart and Jon Turner Applied Research Lab, Washington University www.arl.wustl.edu/~jdd SPP Deployment Plan."

Similar presentations


Ads by Google