Download presentation
Presentation is loading. Please wait.
Published byLee Lamb Modified over 8 years ago
1
News – 22 September 2010 Still more refinements on the understanding of the timepix calibration We are now at the ~20 electron level of precision Propose to periodically update Marina’s summary from 22/09. New Information: In a train of n testpulses, first testpulse is systematically low by ~ 8 mV (even when n=1) The testpulse offset has a small linear dependence on the testpulse value Also have established that DUT had a depletion voltage of ~10 (not ~100) Volts. Hence we operated significantly overdepleted, and measured a worse perpendicular resolution than necessary. However what we measured is probably appropriate for LHCb operating conditions 1
2
Electronics & readout meeting: Doodle poll to establish availabilities: date set for 7 th December in Oxford (many thanks to Andrei). EVO for those who cannot make it. LOI is still in iteration: Please take the opportunity to read/comment/contribute if you did not already do so The strawman module drawing will be updated Information on material will be added March 11 th LHCb Upgrade Meeting Paula Collins 2
3
Testbeam 2009 publication Progressing slowly Some new results shown today Remaining areas: High number of unused clusters mystery Track extrapolation precision simulation/data mismatch LHCb Upgrade Meeting Paula Collins 3
4
Status of 2009 paper (some movement) https://gligorov.web.cern.ch/gligorov/timepixpaper.pdf Comments welcome at any stage https://gligorov.web.cern.ch/gligorov/timepixpaper.pdf Thanks to our heroic editor Vava! (no need to polish your figures etc. he will do this) Status of the sections: Timepix chip description (RP) Timepix Telescope description (RP) Determination of calibration parameters and threshold (MA) Clustering algorithm & results (PC, VG, ZX) Tracking (PC) Alignment (PC,JG) Track Pointing Precision (PC) Data Sets (PC) Determination of zero angle (ZX) General Cluster characteristics (looking for a volunteer!) Landau distributions in DUT (Syracuse) Efficiency and noise as a function of threshold (HG) Timewalk (MvB) Pulseshape (Syracuse) HV Scans (Syracuse) Angle Scans – clusters (Syracuse) Angle Scans - resolutions (PC) 45 degree data angle scans (Syracuse) Row column asymetries (TM, FB) Ikrum scans (DH) 3d sensor (GS) 4 Text and plots exist Plots exist – text on the way Work to do
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.