Presentation is loading. Please wait.

Presentation is loading. Please wait.

AFP Fast Timing System Andrew Brandt, University of Texas at Arlington in collaboration with Alberta, Giessen, Stony Brook, and FNAL, Louvain, LLNL (CMS)

Similar presentations


Presentation on theme: "AFP Fast Timing System Andrew Brandt, University of Texas at Arlington in collaboration with Alberta, Giessen, Stony Brook, and FNAL, Louvain, LLNL (CMS)"— Presentation transcript:

1 AFP Fast Timing System Andrew Brandt, University of Texas at Arlington in collaboration with Alberta, Giessen, Stony Brook, and FNAL, Louvain, LLNL (CMS) OUTLINE: Introduction and requirements Detectors and test beam performance Electronics, including reference timing Laser tests PMT lifetime Cost, Schedule, TDAQ AFP Technical Review CERN April 7, 2011 1

2 10 picoseconds is design goal (light travels 3mm in 10 psec!) gives ~x20 fake background rejection; Stage I: 2014 220 m few 10 33  t < 20 ps Stage II: 2016 add 420 m 10 34  t <10 ps Motivation 22 Use time difference between protons to measure z-vertex and compare with inner detector vertex. In 220 m phase this will provide crucial confirmation that any observed signal is legit Pileup background rejection/signal confirmation Ex: Two protons from one interaction and two b-jets from another WHY? How? How Fast?

3 Final Timing System Requirements 10 ps or better resolution Acceptance over full range of proton x+y Near 100% efficiency High rate capability (~5 MHz/pixel) Segmentation for multi-proton timing L1 trigger Capability Radiation Tolerant 3 Note: For 220 m at modest luminosity/multiple interactions, the requirements are not as stringent: 20 ps resolution, perhaps 1-2 MHz/pixel, multi-protons on same side not a significant problem, and the Level 1 trigger capability is not strictly necessary.

4 AFP Baseline Plan Two types of Cerenkov detector are employed: GASTOF – a gas Cerenkov detector that makes a single measurement QUARTIC – two QUARTIC detectors each with 4 rows of 8 fused silica bar will be positioned after the last 3D-Si tracking station because of the multiple scattering effects in the fused silica. Both detectors employ Microchannel Plate PMTs (MCP-PMTs) 30 cm 4

5 Components of AFP Fast Timing Reference Timing Opto- modules/ ROD HV/LV Cerenkov Radiator L1 Trigger 5

6 From joint 2010 ATLAS/CMS CERN TB  t(G1-G2)=14 ps implies 10 ps single detector resolution! BUT… only one single measurement, no segmentation, electronics challenging. Wonderful detector developed by K. Piotrzkowski (U.C. Louvain). Low index of refraction means little time dispersion, extremely accurate, radiation hard, little material for Multiple scattering GASTOF 6

7 4x8 array of 5-6 mm 2 fused silica bars QUARTIC is Primary AFP Timing Detector UTA, Alberta, Giessen, Stony Brook, FNAL Multiple measurements with “modest” resolution simplifies requirements in all phases of system 1) We have a readout solution for this option (can plug GASTOF into this) 2)We can have a several meter cable run to a lower radiation area where electronics will be located (without degrading overall system resolution) 3)Segmentation and L1 trigger is natural for this detector 4)Possible optimization with fibers instead of bars—discuss later Only need a 40 ps measurement if you can do it 16 times: 2 detectors with 8 bars each, with about 10 pe’s per bar 7 proton photons MCP-PMT

8 Micro-Channel Plate Photomultiplier Tube Burle/Photonis 64 channel 10 and 25  m pore MCP-PMTs have been tested extensively with test beam and laser and would be default for first stage except for lifetime issues (later) 8

9 MCP-PMT Requirements Excellent time resolution: 20-30 ps or better for 10 pe’s High rate capability: I max = 3  A/cm 2 Long Lifetime: Q = 10-20 C/cm 2 /year at 400 nm Multi anode: pixel size of ~6 mm x 6mm Pore Size: 10  m or smaller Tube Size: 40 mm round, 1 or 2 inch square Need to have capability of measurements in different parts of tube between 0-2 ns apart, and in same part of the tube 25 ns apart 9 Photek 240 (1ch) Hamamatsu SL10 (4ch)

10 2010 CMS/ATLAS Fermilab Test Beam 2 x2 mm Trigger Scint siPM courtesy of Ronzhin, Albrow Use siPM in beam as reference for evaluating QUARTIC 10

11 2010 QUARTIC Test Beam Results Time Difference between adjacent bars is <20 ps, implies <14 ps/bar including bar, PMT, CFD! Too good to be true: due to charge sharing and light sharing, bars are correlated. Time Difference between “distant bars” 4 and 7 is 37 ps, implies 25 ps/bar (exceeds QUARTIC design goals!!!) 11

12  t(siPM – Quartic Bar) Tails due to large pulses from multiple protons saturating amps  t=28 ps if Q~25 siPM <15 ps siPM-(avg of 3 quartic bars ) reduced from ~28 (for single bar) to 21ps consistent with expectations Note MCP-PMT with Quartz bar in beam “Nagoya Detector” can give ~5ps resolution 12

13 Giessen Fiber Quartic 13 From Sabrina Darmawi’s thesis, Michael Dueren, Hasko et al Facilitates variable bin size to optimize rate+lifetime Simulations promising Needs upgraded readout electronics to fully evaluate Prototype performance

14 Preliminary Fermilab tests indicate improved time resolution over quartz bars by up to 30%, even though less total light More studies needed including effect of fiber pigtails for better mapping onto the MCP-PMT Alberta Fiber Quartic 14

15 Electronics Layout 15

16 ALCFD ALCFD (Alberta/Louvain Constant Fraction Discriminator): 8 channel NIM unit with mini-module approach tuned to PMT rise time, <5 ps resolution for 4 or more pe’s ZX60 4 GHz amplifier (we use pairs of 4, 8 GHz amps in different combinations to control total amplification) We will replace with diode/amp board that fits on tube Stony Brook upgrade in progress to add trigger capability based on coincidence of quartz bars and basic ADC for monitoring gain 16

17 Alberta HPTDC board 12 ps resolution with pulser including non- linearity corrections. Successfully tested at UTA laser test stand with laser/10  m tube/ZX60 amp/LCFD 17 14 ps TDC resolution in laser tests Test beam data complicated by 19 ns bunch structure

18 Concern:HPTDC designed to operate with 40 MHz clock but with occupancy of <2 MHZ; at high luminosity this might not be sufficient QUARTIC HPTDC Buffering 18 (4 useful channels/ chip instead of 8, but occupancy problem solved, except for ref clock see below) Hit rate (MHz)Total hitsLoss hitsLoss rate 4719079.74e-4 65117458.79e-3 831601073.39e-2 1014241188.29e-2 127391110.15 14306600.196 \ Hit rate (MHz)Total hitsLoss hitsLoss rate 85324411.88e-5 10778322.57e-4 12907266.61e-4 1510713121.12e-3 185998335.5e-3 202404271.12e-2 222589371.43e-2 242747792.88e-2 Loss rate in channel buffer for Logic core clock = 40MHz Loss rate in channel buffer for Logic core clock = 80MHz

19 19 Reference Timing Overview Reference timing is needed to connect two arms ~ 0.5 km apart; what we want is T L -T R, what we measure is (T L -T ref )-(T R -T ref ), so need small jitter in T ref Solution has been developed by SLAC/LLNL involving phase lock loop. We need only minor modifications to use 400 MHz RF instead of 476 MHz, and circuit to convert 400 MHz to 40 MHz and multiplex clock for use in HPTDC board

20 20 Reference Timing Test Results SLAC test show 10 ps total variation over 20 C! Adding a correction for temperature, or controlling temperature of electronics (not cable) will reduce the jitter to a couple ps!)

21 Ref. Timing Rate Reduction Concern: integrating reference time into DAQ since 40 MHz rate too high for occupancy restrictions But actually we only need reference time for good events! 1) Form a trigger based on multiplicity of CFD signals in one row -example if at least 4/8 bars have a signal 2) Only send CFD signals to HPTDC board if trigger is satisfied 3) Trigger reference time signal as well, so a chip will have 4 inputs: three bars in the row where trigger was satisfied, and the ref time signal corresponding to that row 4) possibly also keep some prescaled signals for monitoring 21

22 L1 TRIGGER The Trigger formed in previous slide for controlling reference time rates can also be used for a L1 Trigger, instead of dedicated trigger detector In 2014-2016 simple trigger, based on hits in timing detectors, 1 CTP term for each proton side. Use large diameter air core cables to minimize the cable delay due to latency concerns For 420 can use several bins and combine with jet information from calorimeter 22

23 LeCroy Wavemaster 6 GHz Oscilloscope Laser Box Hamamatsu PLP-10 Laser Power Supply 23 laser lenses filter MCP-PMT beam splitter mirror Established with DOE ADR, Texas ARP funds,

24 Beam Mode Fiber Mode (a) (b) (d) (c) 24

25 10 pe Time Resolution from Laser Tests Laser tests of Photonis 10 µm tube show that with sufficient amplification there is no dependence of timing on gain (low gain operation extends lifetime of tube) 25

26 No rate dependence on number of pixels hit (that’s a good thing!) Saturation from Laser Tests Saturation refers to the reduction in amplitude of the output signal due to the pores becoming busy at the rate increases (typically 1 msec recovery time/pore). This plot shows that saturation is a local phenomena, and is unaffected by multiple channels being on at the same time. 26

27 Lifetime Issues Lifetime due to positive ions damaging the photocathode is believed to be proportional to extracted charge: Q/year = I*10 7 sec/year Q for =2  A/cm 2 is 20 C/cm 2 /yr Can reduce this requirement with fiber detector but still off by at least a factor of 20, so developed an R&D plan to pursue this 27

28 Extending Lifetime Inhibit positive ions from reaching photo- cathode - Ion Barrier: aluminum film on top of MCP’s (had reduced collection efficiency side effect) so Nagoya developed new approach (between MCP’s). Factor of 5 or more lifetime increase (~3 C/cm 2 ) for 4x4 SL10 28

29 Extending Lifetime Minimize creation of positive ions - Use ALD coating of MCP’s (funded SBIR proposal with Arradiance and Photonis in progress) NEW RESULTS HERE Harden photocathode or improve its composition - solar blind photocathode could reduce impact of positive ions 29

30 Photocathode Dual MCP Anode Gain ~ 10 6 Photoelectron  V ~ 200V  V ~ 2000V photon + + MCP-PMT Arradiance coating suppresses positive ion creation (NSF SBIR Arradiance, UTA, Photonis) + Ion Barrier keeps positive ions from reaching photocathode (developed by Nagoya with Hamamatsu Use Photek Solar Blind photocathode or similar (responds only to lower wavelength/more robust) Increase anode voltage to reduce crosstalk (UTA)  V ~ 500V Gain < 10 5 Run at low gain to reduce integrated charge (UTA) Improve vacuum Seal (Nagoya/ Hamamatsu) A Long Life MCP-PMT e-e- 30

31 31 UTA laser results consistent with UTA/FNAL TB results 16 ps for 25 pe (expected amount of Light using quartz radiator in front of SiPM) But this is not viable design, Radiation wise Would need a Quartic-like design Ronzhin, Albrow At FNAL have been studying Possible MCP-PMT Alterntive: SIPM

32 32 Funding Need to discuss with collaborators before filling this out

33 33 Manpower Need to discuss with collaborators before filling this out

34 34 Estimated Production Cost 380k$ for 1Q+1G 500k$ for 1Q+2G 680k$ incl. spares No Gastof option Removes about 100k$ Red numbers are not as well known

35 35 “Schedule” Minimal coupling between timing sub-components means development and production of all parts can proceed essentially in parallel. System factorizes into 1)Radiator: have a quartz bar solution, would prefer fibers if comparable performance 2)PMT: likely modified Planacon or modified SL10, both have same pixel size+layout 3)Electronics chain: amplifier/CFD/HPTDC 4)Reference Clock 5)Infrastructure (HV/LV/Cable) 6)Detector integration into Hamburg pipe 7)TDAQ integration

36 36 Timing TDAQ Integration L1: 2 CTP terms via one long large diameter air-core cable from each side (use ALFA integration solution) Readout: Timing integration to be done via optomodule providing data from HPTDC board to standard ATLAS RODs (whichever ROD is used by Silicon system should work). One 12 channel HPTDC board required/per 8 channels of QUARTIC (each HPTDC board has 3 chips run at 80 MHz, Providing 4 channels each; two chips have 3 Q channels and a clock while the third has 2 Q’s a G and clock). So the one GASTOF one QUARTIC option gives 48 timing readout channels/side while adding an extra QUARTIC gives 96/side. If we add the ADC that would give an ADC channel for each timing channel. So the minimal system (1Q+1G no ADC) has 96 total readout channels, while the full system would have (2Q+1G+ADC) 192+66= 258 channels

37 37 Substantial progress in all phases of fast timing, including integrating trigger capabilities into fast timing detector/electronics We have a prototype fast timing system for AFP that seems to be capable of ~10 ps resolution, validated with beam and laser tests Significant improvements in lifetime by Nagoya/Hamamatsu ; also through UTA collaborations with Arradiance, Photonis, Photek on lifetime. Solution exists for modest integrated charge (few C/cm 2 ), 10-20 C/cm 2 seems achievable on a few year timescale. In progress: final optimization and layout of detector, electronics, PMT; evaluating radiation tolerance/needs of all components Timing detector not on critical path assuming ATLAS approves AFP in a timely manner and R&D, production funding is obtained Conclusions


Download ppt "AFP Fast Timing System Andrew Brandt, University of Texas at Arlington in collaboration with Alberta, Giessen, Stony Brook, and FNAL, Louvain, LLNL (CMS)"

Similar presentations


Ads by Google