BIM on a new railway HS2 Jon Kerbey Director, BIM HS2 Ltd
2
Hs2: the project Strategic intervention Phase One Phase Two Stations:
Euston Old Oak Common Birmingham Interchange Birmingham Curzon Street Phase Two Stations: East Midlands Hub Sheffield Meadowhall Leeds New Lane Manchester Piccadilly Manchester Airport
4
HS2: The Project TimeLine Royal assent Entry to service 2016 2017 2018
2019 2020 2021 2022 2023 2024 2025 2026 Scheme Design Civil Construction Railway Systems Integration Testing and Commissioning Reliability/ Resilience Activity Royal assent Entry to service
5
Realise real value from our digital assets
Opportunity Realise real value from our digital assets
6
Passenger experience Begin with the end in mind
7
Operations & Maintenance
Begin with the end in mind
9
Asset information What? Where? Why? When? Which? Who? Whole-life?
The heart of the virtual railway What? Where? Why? When? Which? Who? Whole-life?
10
What BIM Means to HS2
11
“BIM is our lifeblood … our central nervous system”
Prof. Andrew McNaughton, Technical Director, HS2
12
BIM Strategy
13
£0.5bn saving
14
Measuring value Benefits
15
challenges Procurement
16
INtegration Data-Level WBS ABS CBS
17
Upskilling
18
Future-Proofing
19
Measuring success The test model
20
Challenges Education Specification vs. Innovation
Prior experience of ‘BIM’ Constantly changing and growing organisation Supply Chain capability What and when, not how Software neutral or vendor specific CDE technology provision into the supply chain
21