Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous Acquisition & Control
2
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC Facility Requirements Review Overall Assumptions BSAC Block Diagram BSAC Use Cases SLC Use Cases EPICS Use Cases BSAC Facility Functionality SLC-Aware BPM Facility Requirements EPICS BSACFacility Requirements SLC BPM Facility Interfaces EPICS BSAC Facility Interfaces
3
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 Overall Assumptions There will be no interleaving of straight-ahead beams from the CID injector with LCLS operation. Straight-ahead beams only run when LCLS is not operating If straight-ahead beams are sent the BPMS in sectors 20 - 30 will be required to measure beam position using the LCLS processors and the straight-ahead beam code. LCLS processors are NOT required to read simultaneous electrons and positrons on a single machine pulse SLC-aware IOCs will be present in the injector and linac parts of the LCLS beam line The LTU and Undulator may not require SLC-aware IOCs, as the EPICS control may be complete by the time of LTU commissioning. There will be only one calibration setup at one time BPM modules will be acquiring and buffering LCLS beam synchronous data continuously GADCs and TORO modules may do so as well - TBD
4
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 Block Diagram
5
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC Facility Requirements Review Overall Assumptions BSAC Block Diagram BSAC Use Cases SLC Use Cases EPICS Use Cases BSAC Facility Functionality SLC-Aware BPM Facility Interfaces EPICS BSAC Facility Interfaces
6
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 BSAC Facility Use Cases SLC Use Cases SCP SLC High Level Software Applications SLC Diagnostics SLC Standalone Applications SLC Hardware Configuration and Status EPICS Use Cases Calibration Fast Feedback Diagnostics Hardware Configuration and Status EPICS Clients High Level Software Applications – starting this year
7
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Use Cases Table of High Level Applications Required for LCLS Refer to document
8
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 Table of Application to Function Code Refer to document
9
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 Random Thoughts on SLC Use Cases High level Apps, Diagnostics, Standalone Apps All work through an API that uses a small subset of the defined BPMO message function codes HW Status and Configuration In the SLC database SLC Use Cases are well defined We must try to make new LCLS devices and acquisition “fit in” with minimal changes to the SLC system Must assure that “ignored” function codes do not cause errors (ex: calibration)
10
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 Epics Use Cases Fast Feedback IOC to IOC EDM displays for Configuration and Diagnostics Calibration Implemented in EPICS only Status reported to SLC via HSTA / status bits SLC “lock out” during calibration (if necessary) Diagnostics Displayed in EDM Includes fault-trip data – possibly dumped to file BPM Timing diagnostics included here HW Status Shared by SLC and EPICS – last one to change wins Log or indicate via alarms when out-of-synch New High level Apps. Can we use any SLC support records for future LCLS High Level Apps? Other EPICS clients
11
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 EPICS Use Cases Not well defined Still need to create requirements down to the next level?
12
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC Facility Requirements Review Overall Assumptions BSAC Block Diagram BSAC Use Cases SLC Use Cases EPICS Use Cases BSAC Facility Functionality SLC-Aware BPM Facility Requirements EPICS BSAC Facility Requirements SLC-Aware BPM Facility Interfaces EPICS BSAC Facility Interfaces
13
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 Intro to BSAC Facility Functionality At a high level, the BSAC Facility is required to: Accept SLC data requests for beam synchronous data acquisition for all devices listed in this document to support SLC applications Return beam synchronous data to the SLC Control system in the expected reply structure. Return beam synchronous data to LCLS EPICS Clients. Support calibration of hardware Share calibration status between the SLC control system and the LCLS EPICS system Share hardware status between the SLC control system and the LCLS EPICS system Support Fast Feedback functionality, control, and diagnostics Provide diagnostics from BSAC Facility
14
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 BSAC Facility Functionality The division of labor between the SLC-aware BPM Facility and the EPICS BSAC Facility is a design issue, but some goals for this design are: The SLC-aware threads should act as a “pass-through” facility as much as possible, placing most of the work into EPICS database records and device support. Maintain a clean division between SLC-aware-only functionality and functionality that supports the short and long-term EPICS interface. The SLC-aware-only code will eventually be stripped out. Minimize changes required to SLC interfaces
15
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC Facility Requirements Review 3) BSAC Facility Functionality SLC-Aware BPM Facility Requirements EPICS BSA Facility Requirements 4) SLC-Aware BPM Facility Interfaces 5) EPICS BSAC Facility Interfaces * BSA = Beam Synchronous Acquistion & Control
16
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 3) BSAC Facility Functionality 3.1) Data Flow Timing SLC Aware BPM Facility Requirements EPICS BSAC Facility Requirements
17
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005
18
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005
19
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 3) BSAC Facility Functionality Data Flow 3.2) Timing SLC Aware BPM Facility Requirements EPICS BSAC Facility Requirements
20
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005
21
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005
22
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005
23
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 3) BSAC Facility Functionality Data Flow Timing 3.3) SLC Aware BPM Facility Requirements EPICS BSAC Facility Requirements
24
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware BPM Facility Requirements Accept subset of message function codes from SCP Validate message contents (DB inconsistancies…) send immediate reply “yes/no” Data Acquisition Request: Store user criteria (to EPICS BSA Facility) YY, PP, inclusion/exclusion masks, navg, nrpos, active Track (@ course level) unsatisfied user request Package/send Data Acq Reply upon signal “done” from EPICS BSAC Facility Comply to VMS format Clear one/all user criteria upon request from SCP Package/send all user criteria back to SCP upon request Monitors :State of calibration, shared state of HW Error Logging
25
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 3) BSAC Facility Functionality Data Flow Timing SLC Aware BPM Facility Requirements 3.4) EPICS BSAC Facility Requirements
26
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 EPICS BSAC Facility Requirements Accept and store user request criteria for up to X users Determine, <1/360 sec when EB pattern matches any user criteria Collect matching data into X user collection buffers from all gated devices involved, < 1/120 sec Acquired data must be associated w TS and pulse id from matching EB pattern (or current EB) Indicate to BPM Facility when user data collection complete Provide access to collected data Indicate errors encountered Provide HW config/stat/cal state sharable with BPM Facility
27
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 EPICS BSAC Facility Requirements Provide access to any sharable SLC DB fields EPICS PVs in SLC-Aware IOC must map to the expected PRIM:MICRO:UNIT:SECN names in SLC Database for that SLC-Aware IOC. Phase II Provide acquired data to EDM displays via CA Provide diagnostics data to EDM displays via CA Support fast feedback functionality Support data collection for future LCLS high-level applications
28
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC Facility Requirements Review BSAC Facility Functionality SLC-Aware BPM Facility Requirements EPICS BSAC Facility Requirements 5) SLC-Aware BPM Facility Interfaces EPICS BSAC Facility Interfaces * BSA = Beam Synchronous Acquistion
29
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC-Aware BPM Facility Interfaces SLC Database Service Interface SLC Message Service Interface EPICS BSAC Facility Interface RT DB Access
30
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Database Service I/F Refer to Document (5.1) for: Devices (Primaries) supported/ not supported Secondaries supported/not supported Any EPICS PVs in SLC-Aware IOC must map to the expected PRIM:MICRO:UNIT:SECN names in SLC Database for that SLC-Aware IOC. SLC Database configuration work ahead !
31
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 Message Service I/F Refer to Document (5.2) for: Function codes supported / not supported Message contents supported / not supported Requests from SCP Replies to SCP
32
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 Runtime DB Access to EPICS BSAC Facility (4.3) I/F Tentative, depending on BPM Facility / EPICS BSAC Facility division of labor: Provide EPICS DB for X number of user criteria Signal X number of EPICS user collection buffers of acquired, time stamped, pulse id’ed data Indicate any error conditions Indicate state of hardware /calibration Provide access for any SLC DB fields
33
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC Facility Requirements Review BSAC Facility Functionality SLC-Aware BPM Facility Requirements EPICS BSAC Facility Requirements SLC-Aware BPM Facility Interfaces 6) EPICS BSAC Facility Interfaces * BSA = Beam Synchronous Acquistion and Control
34
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 EPICS BSAC Facility Interfaces 5.1) EVR Interface 5.2) BPM Module Interface 5.3) GADC Module Interface and DUGADC (WIRE, ARRY) 5.4) TORO Module Interface
35
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 EVR Interface Provide data access (RT DB) to EB data EB must provide all bits of PNET YY PP Beamcode Inclusion/exclusion bits Pulse id – need 17-bit EB must include time stamp EB must be buffered EB pattern matching user criteria comes (3) 360Hz timing fiducials before beam pulse
36
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 BPM Module Interface Provide data access (RT DB) to Acquired data HW status Cal status? Data must be stored in circular buffer for consecutive pulse retrieval User initiated Fault trip Data must be time stamped (EPICS)
37
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 General Interface with all BSAC Modules Provide data access to acquired data and status Data must be EPICS time stamped GADC: Current Stepper Motor position must be available each step to correlate with acquired data for wire scans
38
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 BPM Data Requirements SLC Requires: x float (x rms) y float (y rms) Tmit float (tmit rms) qraw[4] unsigned short status (stat) on ea pulse unsigned short For SCP/LCLS diagnostics SCP defines certain bits; these can change HSTA state goodmeas unsigned short x, y, tmit RMS values, goodmeas, HSTA state for SCP BPM or EPICS BSA Facility could do this
39
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 WIRE Data Requirements Does LCLS require current (i) data from wire scan? SLC requires, for scanning wire: Data array [max_wire_chan=3] of float (& RMS) Status array [3] of unsigned short For SCP/LCLS diagnostics SCP defines certain bits; these can change HSTA state Position of SMC per step goodmeas array [3] of unsigned short RMS, goodmeas, HSTA state values for SCP BPM or EPICS BSA Facility
40
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 ARRY Data Requirements SLC requires: Data array [max_arry_chan=12] of float (&RMS) Raw array [12] of unsigned short Status array [12] of unsigned short For SCP/LCLS diagnostics SCP defines certain bits; these can change HSTA state (BPM Facility could do this) goodmeas array [12] of unsigned short Data RMS, goodmeas values for SCP – BPM or EPICS BSA Facility
41
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 TORO Data Requirements SLC requires: tmit float (tmit RMS) qraw unsigned short status unsigned short For SCP/LCLS diagnostics SCP defines certain bits; these can change HSTA state qraw unsigned short goodmeas unsigned short tmit RMS, goodmeas, HSTA state for SCP BPM or EPICS BSA Facility
42
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 Pulse Id data requirements SCP user can ask for associated pulse id data to accompany the acquired data Pulse id (retrieved from PNET) Time stamp (17-bit; from EVR?)