Download presentation
Presentation is loading. Please wait.
Published byDustin Paul Modified over 8 years ago
1
PANDA Collaboration Meeting D. Rodríguez Piñeiro 24. 09. 2010 SciTil and Next Steps
2
EMC BW Endcap 24/09/2010Mainz Group Meeting2 Scintillator Tile Hodoscope: SciTil
3
EMC BW Endcap 24/09/2010Mainz Group Meeting3 Scintillator Tile Hodoscope: SciTil Space for these Tiles: - According to Lars: Nothing - According to Philippe: 30 mm Inwards
4
EMC BW Endcap 24/09/2010Mainz Group Meeting4 Impact 30 mm Inwards in the BW EMC
5
EMC BW Endcap 24/09/2010Mainz Group Meeting5 Impact 30 mm Inwards in the BW EMC 30 mm smaller DIRC Tracker Supplies (x4)* 10 mm safe distance 5 mm safe distance Tracker Supplies Supports
6
EMC BW Endcap 24/09/2010Mainz Group Meeting6 Scintillator Tile Hodoscope: SciTil 136 Crystals Loss: 25,2% Less 404 Total
7
EMC BW Endcap 24/09/2010Mainz Group Meeting7 Avoiding Cooling in the Front - Using a “new” Carbon Fiber type for Alveoles: High Thermal Conductivity - Crystals Wrap: Single crystal, packs of 4 - Second Cross Made of Copper - Copper Inner-Outer Ring
8
EMC BW Endcap 24/09/2010Mainz Group Meeting8 Avoiding Cooling in the Front - Copper Activation must be Checked - Physics Simulations to Be Done
9
EMC BW Endcap 24/09/2010Mainz Group Meeting9 Thank you!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.