Download presentation
Presentation is loading. Please wait.
Published byAusten Cameron Modified over 8 years ago
2
Welcome to Uppsala! Thursday May 18 13:00, room Å4003 15:00 Coffee (17:30 Dinner) Friday May 19 09:00, room Å4003 10:00 Coffee splinters (other locations) 11:30 Lunch 13:00 Room Å4003 splinters (other locations) 15:30 end meeting Mats André mats.andre@irfu.se
3
Draft Agenda May 18 Welcome, Cluster and EFW basics and status (MA) EFW modes and operations (AIE) EFW internal burst mode statistics (NE) EFW SC 1 and 3 operations (AIE, YK) Cluster data sets: CDs, DDS, CSDS, CAA (PAL) The CAA: where we are and where we are going (HL) Data exchange (beyond standard archives) (AV, SB) Coffee CAA data production (YK) Revised look at plasma densities from Cluster SC potential (AP) Polar wind measurements from wake studies (AIE) ISADT analysis software (AIE, YK. RG) Publications and future meetings (MA) AOB
5
Cluster Mission Overview Launch: summer 2000 Nominal mission: 2001 and 2002 (50%) Extension 1: 2002 to 2005 (100%) Extension 2: 2005 to 2009 (100%) All spacecraft fully operational
9
Separation distance strategy C1C1 C2C2 C3C3 C4C4 d C1,C2,C3 C3,C4 cusp tail
12
Tail 2005
14
Cluster Instrument Status Most instruments are operational Not operational ASPOC C1 (presently no ASPOC running) CIS C2 EDI C4
15
www.cluster.irfu.se/efw www.cluster.irfu.se/efw => operations => EFW for Dummies EFW Electric Field and Wave
16
Common EFW Modes Normal Mode Telemetry (full orbit) 2 E-field signals, 25 samples/s 4 single probe signals, 5 samples/s Burst Mode 1 Telemetry (hour) 2 E-field signals, 450 samples/s 4 single probe signals, 5 samples/s Internal EFW burst (around 10 s) 4 single probe signals, few 1000 samples/s
17
EFW operational on all four SC SC 1 Problem probe 1, 2001-12-28, somewhat reduced science data. SC 2 Filter problem, 2001-07-25. Solution: use 180 Hz filter also in NM (25 samples/s) on all probes. SC 3 Problem probe 1, 2002-07-29, somewhat reduced science data. SC 4 OK
18
SC 1, probe 1 and SC 3, probe 1 First workaround: use only probe pair 3+4 EFW prime parameters (4s) OK Reprogrammed to use 3 probes to get 2 orthogonal E (routine operations from late September 2003) From January 2006: In NM, use only probe pair 3+4 for E use probe 2 to get SC potential at 25 samples/s
19
SC spin axis tilt WHISPER proposal
20
Tilt is feasible Thermal main constraint Decide later Duration a few weeks 45 degrees? Apil 2007? SC spin axis tilt
21
http://sprg.ssl.berkeley.edu/themis/flash.html
22
EFW webpage www.cluster.irfu.se
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.