Download presentation
Presentation is loading. Please wait.
Published byBrenda Walters Modified over 8 years ago
1
Communications Committee March 6 th 2010
2
Promotional Literature: We are in production of two tri-folds, one on Awards and one on Women in Engineering. There should be ready for the first conferences. I am presently awaiting an estimate from Cisneros. Booth: All is ready for the first conferences this year.
3
Distribution: I am investigating the hand-over of the storage and shipping of the booth and the promotional materials. Vista has been doing this for over 10 years and this has to be transitioned to a service as it is unrealistic for a volunteer to do this from home and few of us have access to facilities as I do. The plan, if this works out, would be for this to start in 2011. Web Site: The final conversions of the web site are underway. This was/is a much bigger job that originally planned but I hope that new uniformity is effective. The current status of this completion is that it has been delayed 3-4 weeks by getting the PO extended but work has just started with a scheduled completion in about three weeks.
4
Use of IEEE Master Brand: When using the IEEE logo, please check with the design rules – they can be found by going to www.ieee.org and searching on “logo”www.ieee.org Slide Templates: Please remember to consider the slide template for your presentations where appropriate.
5
Membership It has been a good year for new members. This from the January Membership Report: Graphs follow:
6
IEEE Survey on Reasons for Joining From the January Membership Report:
7
IEEE General First Year Member Retention
8
Membership Statistics
9
Membership % Changes
10
Thank You! To everyone for working on Member and non-member communications!
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.