Tools Report Engineering Node March 2007

Similar presentations


Presentation on theme: "Tools Report Engineering Node March 2007"— Presentation transcript:

1 Tools Report Engineering Node March 2007 http://pds.nasa.gov

2 29 March 2007Tools Report2 Topics Validation Tool Label Template Design Tool Legacy Tools

3 Validation Tool

4 29 March 2007Tools Report4 Recent Accomplishments Reported status and plan to MC (Aug 2006) Alpha Test I (Aug 2006) –Participating Nodes: Atmospheres, Geosciences and PPI. Alpha Test II (Sep 2006) –Participating Nodes: Atmospheres, Geosciences, Imaging, Rings and Small Bodies. Defined Phase II Scope (Oct 2006) –This was accomplished during the F2F Tech Session. Reported status and plan to MC (Nov 2006) Beta Test (Mar 2007) –Participating Nodes: Engineering, Geosciences Imaging, NAIF, PPI, Rings and Small Bodies. New Project Web Page (Mar 2007) –http://pds-engineering.jpl.nasa.gov/index.cfm?pid=100&cid=104http://pds-engineering.jpl.nasa.gov/index.cfm?pid=100&cid=104

5 29 March 2007Tools Report5 Liens for Release 1.0.0 Sub-objects not allowed in an explicit FILE object –VTool does not allow sub-objects to be present in an explicit FILE object as a result of the FILE object definition currently specified in the PDS data dictionary. SCR 3-1089 addresses this issue. Checking for Label Padding –Validation of proper label padding has not been implemented yet due to a need for further clarification on this capability and its lack of priority.

6 29 March 2007Tools Report6 Plan Complete Development (Mar-Apr 2007) –Addressing liens and comments resulting from beta testing. Present Readiness for Release to MC (Mar 28-29, 2007) –Ask for permission from MC to go ahead with release. Prepare Release (Early Apr 2007) –Perform acceptance testing at the Engineering Node and prepare report. –Complete release documentation and prepare distribution package. Release 1.0.0 (Apr 13, 2007) –Post distribution package to the PDS software download page. –JPL Software Authority has blessed distribution of binary and source to the PDS community including international. Phase II Design and Development –As prioritized at the F2F Tech Session.

7 Label Template Design Tool

8 29 March 2007Tools Report8 Accomplishments Use Cases and Requirements Updated (Jan 2007) –Comments from the F2F Tech Session were incorporated. –Additional efforts from the Working Group were also incorporated. Level 4 Requirements Approved by MC (Feb 2007) Preliminary Design Initiated (Mar 2007) –Focusing on usability requirements and development approach. New Project Web Page (Mar 2007) –http://pds-engineering.jpl.nasa.gov/index.cfm?pid=100&cid=101http://pds-engineering.jpl.nasa.gov/index.cfm?pid=100&cid=101

9 29 March 2007Tools Report9 Plan Preliminary Design Review (Apr 2007) Design Review and Code Walkthrough (May 2007) Alpha Test (Jul 2007) Beta Test (Aug 2007) Release (Sep 2007)

10 Legacy Tools

11 29 March 2007Tools Report11 Status Currently preparing release 4.6 of the PDS Tools Package. Includes a number of fixes to LVTool and NASAView since the last release. Currently working on a NASAView issue reported by Mike A’Hearn. The release will come out shortly after the Validation Tool release.