Presentation is loading. Please wait.

Presentation is loading. Please wait.

802.16 Project Planning Committee (PPC): Session #69 WG Closing Plenary Report IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE.

Similar presentations


Presentation on theme: "802.16 Project Planning Committee (PPC): Session #69 WG Closing Plenary Report IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE."— Presentation transcript:

1 802.16 Project Planning Committee (PPC): Session #69 WG Closing Plenary Report IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE 802.16ppc-10/0014 Date Submitted: 2010-09-15 Source: Jose Puthenkulam E-mail: jose.p.puthenkulam@intel.com Project Planning Committee Chair Venue: St. Petersburg, Russia Base Contribution: None Purpose: 802.16 Project Planning Committee Session #69 WG Closing Plenary Report of activities Notice: This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16. Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: and.http://standards.ieee.org/guides/bylaws/sect6-7.html#6http://standards.ieee.org/guides/opman/sect6.html#6.3 Further information is located at and.http://standards.ieee.org/board/pat/pat-material.htmlhttp://standards.ieee.org/board/pat

2 23/15/2016 Outline PPC Agenda and Activities this week M2M System Requirements Study Items Update

3 33/15/2016 PPC Plan and Agenda this week Time slotsAgenda Tue: PM (1-4PM) Opening Project Planning Discussion M2M Requirements Tue: PM2 (4-6PM) TDD Co-existence Study Report, ATIS/TIA Co-existence Discussion Content for M2M – for ITU-R WP5A contribution M2M Requirements (Continued) Hierarchical Networks Study Report New Study Topics Wed: AM2 (10AM-12 PM) Joint session with GRIDMAN (Proposed) Discussion on Requirements Overlap issues between M2M (P802.16p) and GRIDMAN (P802.16n) Group key management ITU-R WP5A contribution Wed: PM1 (1-4PM) Response to ITU-R WP5A contribution Hierarchical Networks Study Report M2M System Requirements Wed: PM2 (4-6PM) New Study Topics Closing

4 43/15/2016 M2M System requirements (1/2) Input contributions for M2M SRD (12): C80216ppc-10_0060r1 C80216ppc-10_0059r1 C80216ppc-10_0058 C80216ppc-10_0057r1 C80216ppc-10_0055r1 C80216ppc-10_0054r1 C80216ppc-10_0053 C80216ppc-10_0052 C80216ppc-10_0051 C80216ppc-10_0050 C80216ppc-10_0049r1 We also discussed the M2M related work in ITU-R WP5A We received an input contribution on this (C802.16ppc-10_0063) for ITU LG We had input contribution proposing a response (C802.16ppc-10_0064) We drafted a Response to the ITU LG 802.16ppc-10_0013

5 53/15/2016 M2M System Requirements (2/2) After discussion of all the M2M System requirements contributions. We have an updated M2M System Requirements document (802.16ppc-10/0011r2) We will issue a call for contributions for Nov session to further update the requirements. –One of focus areas is performance requirements Objective is to help the future 802.16p Task Group have an initial SRD to expedite their work. Requirements co-ordination with GRIDMAN: –We had a joint session with GRIDMAN on Wednesday. –We identified Group Management/Group Key Management as one area of potential overlap –We also discussed the ITU-R WP5A M2M work in C802.16ppc- 10_0063

6 63/15/2016 Study Items Update (1/3) Input contributions for Study items: –Hierarchical Networks: C80216ppc-10_0061 C802.16ppc-10_0062r1 –TDD Co-existence: None Input contributions for New Study topics: C80216ppc-10_0056

7 73/15/2016 Study Items Update (2/3) Study Items completed: –M2M Study Report and PAR & 5C proposed (P802.16p - 802.16ppc- 10/0003r9 )802.16ppc- 10/0003r9 –PAR Approval expected end of Sept. Task Group expected to start in Nov. Study Items in progress: –Hierarchical Networks Study Report working draft was updated - 802.16ppc-10/0008r1 using the input contributions –TDD Co-existence Study Report had no updates– 802.16ppc-10/0007 Call for input contributions for all Study items open will be issued for Nov session

8 83/15/2016 Study Items Update (3/3) New Study topics: –We reviewed contribution C802.16ppc-10/0056. –We also reviewed the ITU-R Recommendation M.1645 and after quite a bit of discussion. –We discussed a proposal to start a new Study Item on “Vision for Systems Beyond IMT-Advanced” Motion to start new Study Item on “Vision for Systems Beyond IMT-Advanced” –Moved: Shilpa Talwar –Second: Vibhor Jhulka –Passes with Unanimous Consent Intent is to use this report for making contributions to the ITU LG for towards ITU-R discussions on the subject

9 93/15/2016 Backup

10 103/15/2016 802.16 Project Planning Map (1/2) Study Items DescriptionProject Target TimeLine M2M First Phase: New requirements for massive number of devices to be connected over 16 Networks. Study Item started: Mar 2010 WG PAR Approval: May 2010 EC PAR Approval: Jul 2010 TG Start: Nov 2010 Std Completion: Jul, 2012 Later Phase: More Advanced M2M capabilitiesTBD Hierarchical Networks Same RAT: Extensions to Advanced Air Interface (802.16m) for multi-tier deployments 802 Multi-RAT: Advanced network topologies offering high capacity at low cost Client Collaboration: Co-operation amongst clients Study item started: May 2010 WG PAR Approval: Jan 2011 EC PAR Approval: Mar 2011 TG Start: TBD Std Completion: TBD Co-existence with non- 802 TDD systems Co-existence with non-802 TDD systems. Example: TDS-CDMA, TD-LTE Study item started: May 2010 WG PAR Approval: TBD EC PAR Approval: TBD TG Start: TBD Std Completion: TBD

11 113/15/2016 802.16 Project Planning Map (2/2) Study Items DescriptionProject Target TimeLine Enhanced QOE Improved quality of experience for mobile internet applications WG PAR Approval: 2011 EC PAR Approval: TBD TG Start: TBD Std Completion: TBD Ultra High Speed Networks (>1-5Gbps) Advanced MIMO, Higher Order Modulation, Higher Bandwidths, Multicarrier WG PAR Approval: 2011 EC PAR Approval: TBD TG Start: TBD Std Completion: TBD Green RANEnergy savings at Client and Network WG PAR Approval: 2011 EC PAR Approval: TBD TG Start: TBD Std Completion: TBD


Download ppt "802.16 Project Planning Committee (PPC): Session #69 WG Closing Plenary Report IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE."

Similar presentations


Ads by Google