PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.

Similar presentations


Presentation on theme: "PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI."— Presentation transcript:

1 PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI

2 PACS IHDR 12/13 Nov 2003 Digital Processing Unit2/15 FUNDING AND DELIVERY CRITICALITY FACT: IFSI has got no funds from ASI after 2001, that has prevented attendance at meetings, reviews, support during integrations…… FACT: the ASI-Carlo Gavazzi Space contract has been extended up to 31/01/2004 PREDICTION: from now up to 31/01/2004 a new contract/addendum will be issued taking into account the PD#4 items (e.g. the SW reset of the IEEE-1355 chip); the new contract/addendum will expire at the end of 2004 FACT: the lack of funds, the stop of CGS activities (waiting for the PD#4 ASI approval) and the present HW problems have driven a very critical DPU/ICU Herschel schedule

3 PACS IHDR 12/13 Nov 2003 Digital Processing Unit3/15 Design status (1/2) -During the AVM tests a random loss of the 1355 links has been detected and investigations are in progress to identify the source of the problem -At present the IFSI unit is at CGS to carry out the investigation -The analysis (thanks also to CSL, IAC and MPE for their help!) has shown that consecutive addressing of the STD-1553 Dual Port RAM and of the IEEE-1355 Dual Port RAM causes the loss of the 1355 links. The HW is now suspect. -The design of the HW boards (contracted to Carlo Gavazzi Space) will be corrected in EQM and FM to include the necessary modifications resulting from the fixing of the above problem

4 PACS IHDR 12/13 Nov 2003 Digital Processing Unit4/15 DESIGN STATUS (2/2) AVM SW nearly completed; missing items: new OBCP and autonomy function (to be implemented when available) patching uploading of OBCP implemented but not tested other types of patching not addressed Burst mode implemented but not thoroughly tested upgrading of the VIRTUOSO O.S.: waiting for an offer from WIND RIVER New OBS image uploadable with the BOOT SW

5 PACS IHDR 12/13 Nov 2003 Digital Processing Unit5/15 SW DOCUMENTATION SSD: is in progress, issue 1 should be available by the end of November (SW requirements inserted, logical model and architecture design revised) DDD: a new issue will be ready after the SW is stabilized SVVP: a new issue was circulated according to S. Thurey’s comments. Some comments require a new document layout and a new release will be issued asap in line with IFSI manpower

6 PACS IHDR 12/13 Nov 2003 Digital Processing Unit6/15 BUDGETS FOR FM (1/2) (ACTUAL MASS INFERRED FROM AVM BOARDS) Box weight (mechanics):3037 g CPU Boards (2 of): 960 g I/F Boards (2 of): 640 g DC/DC Boards (2 of) (E):1000 g Motherboard: 520 g Screws etc.: 100 g Cabling (E): 300 g Conformal coating (E): 420 g TOTAL (E) 6977 g (+-200 g)

7 PACS IHDR 12/13 Nov 2003 Digital Processing Unit7/15 BOX INTERFACE CONTROL DRAWING

8 PACS IHDR 12/13 Nov 2003 Digital Processing Unit8/15 BUDGETS FOR FM (2/2) TOTAL ESTIMATED POWER (DC/DC CONVERTER EFFICIENCY = 70%): 14.6 W

9 PACS IHDR 12/13 Nov 2003 Digital Processing Unit9/15 CPU BOARD DSP 21020 RAM FPGA EPROM 20 MHz IEEE-1355 MEZZANINE JTAG

10 PACS IHDR 12/13 Nov 2003 Digital Processing Unit10/15 I/F BOARD FIFOS S/S I/FsA/D Conv. 16 MHz 1553B ( S/C I/F) Long Stub Trafos “A” and “B” FPGA NOT FOR PACS

11 PACS IHDR 12/13 Nov 2003 Digital Processing Unit11/15 DPU

12 PACS IHDR 12/13 Nov 2003 Digital Processing Unit12/15 AIV FLOW

13 PACS IHDR 12/13 Nov 2003 Digital Processing Unit13/15 EQM SCHEDULE (TENTATIVE)

14 PACS IHDR 12/13 Nov 2003 Digital Processing Unit14/15 FM SCHEDULE (TENTATIVE)

15 PACS IHDR 12/13 Nov 2003 Digital Processing Unit15/15 PA/QA ACTIVITIES ALL COMPONENTS ARE BOUGHT THROUGH THE CO-ORDINATED PARTS PROCUREMENT AGENCY FOR INDUCTORS AND TRANSFORMERS RELEVANT RFAs AND PADs ISSUED NO RE-FLOW SOLDERING IS FORESEEN: ALL HAND MADE SOLDERS (INCLUDING SMD) BY ESA QUALIFIED PERSONNEL ENVIRONMENTAL QUALIFICATION TESTS ARE SCHEDULED FOR QM UNITS (A REDUCTION SET OF TESTS, ON THE GROUNDS OF SIMILARITY, IS UNDER EVALUATION) ENVIRONMENTAL ACCEPTANCE TESTS ARE SCHEDULED FOR FM UNITS (A REDUCTION SET OF TESTS, ON THE GROUNDS OF SIMILARITY, IS UNDER EVALUATION)