Presentation is loading. Please wait.

Presentation is loading. Please wait.

AMENDMENTS TO CDRH LASER STANDARD. TEPRSSC ‘99 Revisited. Presentation Summary. Discussion Summary.

Similar presentations


Presentation on theme: "AMENDMENTS TO CDRH LASER STANDARD. TEPRSSC ‘99 Revisited. Presentation Summary. Discussion Summary."— Presentation transcript:

1 AMENDMENTS TO CDRH LASER STANDARD

2 TEPRSSC ‘99 Revisited. Presentation Summary. Discussion Summary

3 TPRSSC ‘99 Presentation Motivations History Proposed CDRH Amendments (FR 3/24/99) Status of IEC 60825-1 Options for CDRH

4 TEPRSSC ‘99 Panel Discussion Motion approved: –Wait for IEC votes –Proceed with all due haste Other discussion: –CDRH taking the lead –Do not include LEDs –Reduce CDRH/IEC gap NOT Discussed: –Vertical standard for toy/novelty lasers

5 STATUS OF THE IEC AMENDMENTS  CDV approved 15:1 9/30/99  TC76 Plenary voted (11/12/99) to distribute FDIS for vote in 04/00  FDIS delivered to IEC CO 3/1/00  IEC plans to distribute FDIS in June with voting to close in August  If approved, the amended IEC standard may be published in October, 2000

6 TEPRSSC ‘00 Handout (Briefing Package) Draft revised proposed amendments to the CDRH Standard Revisions based on presumption of approval of the IEC FDIS Revisions are still an incomplete draft

7 WHY REPROPOSE? Significant changes since 1999 proposal –1999 based on 1995 IEC Scheme –1999 IEC CDV for 2000 Amendment Hew Classification scheme New measurement requirements New AELs w/short pulse limits & photochemical vs thermal limits

8 HIGHLIGHTS OF REVISIONS Class designations 1, 1M, 2, 2M, 3R, 3B, 4 Update emission limits –Short emission durations 10 -13 s. –Photochemical vs. thermal limits Human access criteria

9 HIGHLIGHTS OF REVISIONS (Cont.) Classification measurements Service information Class 1 Limit for novelty/toy laser products Clarify military exemption requirement

10 PRESENT TASKS  Complete draft revised amendments for CDRH standard.  Rework IEC FDIS into CDRH format  Prepare preamble Analysis of comments from 3/24/99 FR notice.

11 FUTURE TASKS  Agency clearances  OCC  OMB  FDA  Impact analyses  Rollout  CDRH Staff training  Revision of guidance documents, report guides  Field training  Industry education

12 TEPRSSC INPUTS Agreement w/reproposal Technical comments What if IEC FDIS not approved –Modify reproposal –Continue w/reproposal


Download ppt "AMENDMENTS TO CDRH LASER STANDARD. TEPRSSC ‘99 Revisited. Presentation Summary. Discussion Summary."

Similar presentations


Ads by Google