Download presentation
Presentation is loading. Please wait.
Published byNoah Chase Modified over 8 years ago
1
Lisbon, 29.-30.01.2004 1 Report on OBT installations -50 OBTs and sensors to be installed on wagons: - 35 CP (sggmrss – flat wagon with 102 ton cargo capacity) - 10 SNCF (8 S56, 2 s58 – steel coils and old iron) - 5 SZ (3 Uacs – borax, 2 Himrs) -OBT installation sites: - CP: Bobadela Intermodal Terminal, near Lisbon - SNCF: Miramas, marshalling yard near Marseille - SZ: Divaca, maintenance plant -Delivery of OBTs: - CP: OBTssensors (shipped) - SNCF:OBTssensors - SZ:OBTssensors
2
Lisbon, 29.-30.01.2004 2 OBT Installations - OBTs delivery place: - SNCF: Miramas - SZ: PI premises - Purchase of 15 OBT-s – not yet: -SCIRO:6 OBTs -IVU:4 OBTs -EDC:3 OBTs -PI:2 OBTs Logosystem is waiting for EDC order – problem with TECHNO invoice (19.12.03 – solved? ). Transportdata needs to return to EDC 13 unused SIMs (9.12.03 – sloved? ). GC has sent to Mr. Santucci OBTs consignment status inquiry e-mail (16.01.03). Anticipation of invoice issue by Logosystem? Anticipation of delivery date:
3
Lisbon, 29.-30.01.2004 3 - Realisation and supervision of OBT installation: - Installation of OBTs will be performed by the operators’ personnel under the supervision of provider’s technical staff (Logosystem) – SNCF: 3 days, SZ 2 days Anticipation of installation date: -Wagon numbers available? -CP? -SNCF? -SZ has provided 3 wagon numbers, 2 in a short notice before installation – upon availability. -F-MAN tests notification -Fleet managers on corridors should receive notice about wagons on test corridors. Wagons without corridors run without restrictions. Wagon owner should be addressed by F-MAN scientific coordinator. OBT Installations
4
Lisbon, 29.-30.01.2004 4 OBT Installations - actions
5
Lisbon, 29.-30.01.2004 5 OBT Installations - actions
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.