Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 4th of october, 2006 © ATHENA Consortium 2006 Collaborative Process: Change management Design Time Demonstration: Maestro, Nehemiah, Jonhson, Gabriel.

Similar presentations


Presentation on theme: "1 4th of october, 2006 © ATHENA Consortium 2006 Collaborative Process: Change management Design Time Demonstration: Maestro, Nehemiah, Jonhson, Gabriel."— Presentation transcript:

1 1 4th of october, 2006 © ATHENA Consortium 2006 Collaborative Process: Change management Design Time Demonstration: Maestro, Nehemiah, Jonhson, Gabriel LGPEADS

2 2 4th of october, 2006 © ATHENA Consortium 2006 Collaborative Process: Change management Feedback Still some bugs to fix (ongoing) to be able to address runtime (target for last review) Some integration and design issues Need for CBP documented XML format or UML profile ( deriving from existing standards) What about legacy engines? Need for facilities to defined messages/services between Receiving and Sending points, and to perform mapping with relevant workflow data What about calling services other than WEB services? Easier integration between Maestro/Nehemiah/Gabriel/Johnson From Business point of view, it really responds to an important need to hide private processes and to interconnect several enactment services with distributed activities From innovative point of view, it is really something new not addressed by current tools and standards.

3 3 4th of october, 2006 © ATHENA Consortium 2006 Task parameterisation LGP

4 4 4th of october, 2006 © ATHENA Consortium 2006 Services and schema definition Defined by creating WSDL and schemas by hand. WSDL is mapped with Workflow relevant data in Maestro => Long task requiring expertise in WSDL and XML schemas

5 5 4th of october, 2006 © ATHENA Consortium 2006 Partners definition in Nehemiah from Maestro

6 6 4th of october, 2006 © ATHENA Consortium 2006 Interconnection between Task Manager and Maestro through parameterisation

7 7 4th of october, 2006 © ATHENA Consortium 2006 Private process LGP

8 8 4th of october, 2006 © ATHENA Consortium 2006 Different steps

9 9 4th of october, 2006 © ATHENA Consortium 2006 Assign service to a receiver

10 10 4th of october, 2006 © ATHENA Consortium 2006 Map service to schema (workflow relevant data to message exchanged and defined in wsdl)

11 11 4th of october, 2006 © ATHENA Consortium 2006 Map service to schema (2) (workflow relevant data to message exchanged and defined in wsdl)

12 12 4th of october, 2006 © ATHENA Consortium 2006 Endpoints parameterisation LGP


Download ppt "1 4th of october, 2006 © ATHENA Consortium 2006 Collaborative Process: Change management Design Time Demonstration: Maestro, Nehemiah, Jonhson, Gabriel."

Similar presentations


Ads by Google