Mid Term Review Meeting, 26 September 20121 * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh Programme under contract number (PITN-GA-2010-264330-CATHI) Co-ordinator’s Report CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Yacine Kadi (EN-HDO) Project Co-ordinator Mid-Term Review Meeting, 26 September 2012
2
Mid Term Review Meeting, 26 September 20122 Co-ordinator’s Report Outline The ISOLDE Facility and it’s upgrade: HIE- ISOLDE CATHI and HIE-ISOLDE Scientific Overview Networking Administrative & Management Issues Conclusions and Prospects
3
Mid Term Review Meeting, 26 September 20123 Co-ordinator’s Report ISOLDE: the ISOL-type RIB facility @ CERN Pulsed 1.4 GeV Proton beam Courtesy D. Voulot
4
Mid Term Review Meeting, 26 September 20124 Co-ordinator’s Report USERS & SCIENCE > 500 users (~5% of CERN’s total) 25 countries; 100 institutions 175 experiments (4 years)
5
Mid Term Review Meeting, 26 September 20125 Co-ordinator’s Report RESEARCH @ ISOLDE
6
Mid Term Review Meeting, 26 September 20126 Co-ordinator’s Report ISOLDE Today Offers the Largest Range of Available Isotopes Worldwide
7
Mid Term Review Meeting, 26 September 20127 Co-ordinator’s Report HIE-ISOLDE aims at increasing the energy of the RIB up to 10AMeV and their intensity by a factor 10 Energy Upgrade: The HIE-ISOLDE project concentrates on the construction of the SC LINAC and associated infrastructure in order to upgrade the energy of the post- accelerated radioactive ion beams to 5.5 MeV/u in 2014 and 10 MeV/u by 2016 Intensity Upgrade: The design study for the intensity upgrade, also part of HIE-ISOLDE, started in 2012, and addresses the technical feasibility and cost estimate for operating the facility at 15 kW once LINAC4 and PS Booster are online. Beam Quality Upgrade: RFQ cooler and buncher Solid state lasers for RILIS Higher mass resolving power HRS
8
Mid Term Review Meeting, 26 September 20128 8 Courtesy F. Wenander
9
Mid Term Review Meeting, 26 September 20129 Co-ordinator’s Report Superconducting LINAC installed in Three Phases 3 stages installation 1.2 MeV/u 3 MeV/u 5.5 MeV/u 10 MeV/u Now 2014 2016 >2017
10
Mid Term Review Meeting, 26 September 201210 Co-ordinator’s Report NuPECC Long Range Plan 2010 Timeline for RIB Facilities
11
Mid Term Review Meeting, 26 September 201211 Co-ordinator’s Report Outline The ISOLDE Facility and it’s upgrade: HIE-ISOLDE CATHI and HIE-ISOLDE Scientific Overview Networking Administrative & Management Issues Conclusions and Prospects
12
Mid Term Review Meeting, 26 September 201212 Co-ordinator’s Report CATHI and HIE-ISOLDE CATHI – Cryogenics, Accelerators and Targets at HIE-ISOLDE. The HIE-ISOLDE project at CERN is an ideal R & D opportunity to train young engineers over a range of disciplines relevant to the accelerator and nuclear industry. CERN and the associated partners of CATHI can provide excellent hands-on and academic training. ISOLDE provides a multi-disciplinary environment on a scale that encourages collaboration and teamwork.
13
Mid Term Review Meeting, 26 September 201213 Co-ordinator’s Report Research Training Themes (20 Fellows over 4 years)
14
HIE-ISOLDE Project 1. Project Management 2. Linac Systems 4. Installation & Commissioning 4. Installation & Commissioning 3. Infrastructure & Integration 3. Infrastructure & Integration 8.3 Fire & Gas Hazard GS/ASE 8.2 Radioprotection DG/SCR HIE-LINAC Design Study 5. Target Study 6. Target Area and Class-A Lab Integration 7. Injection & Beam distribution 8.4 Access System GS/ASE 8. Safety 2.1 Cavity RF BE/RF 2.2 Cavity Design manufacturing EN/MME TE/VSC 2.3 Beam dynamics BE/RF-ABP 2.4 Cryomodules TE/MSC EN/MME 2.5 Beam Instrumentations BE/BI 2.6 SC Solenoid TE/MSC 2.7 Beam transfer line (magnets) TE/MSC 2.8 Linac Integration EN/MEF 2.9 Vacuum TE/VCS 2.10 Survey BE/ABP 3.4 Electrical systems EN/EL 3.5 Cryogenic system TE/CRG 3.6 Power converters TE/EPC 3.7 Industrial Control system EN/ICE 4.1 Single cavity test BE/RF 4.2 Cryomodule test BE/RF 4.3 Transport & Handling EN/HE 3.8 Beam Control system BE/CO 5.1 Target design EN/STI-HE 5.2 Front Ends EN/STI TE/EPC-ABT 5.3 Beam Diagnostics BE/BI 6.1 Layout upgrade EN/MEF 6.2 Cooling and ventilation EN/CV 6.3 Electrical systems EN/EL 6.4 Vacuum TE/VCS 6.5 Survey BE/ABP 6.6 Civil engineering GS/SEM 6.7 LL Control system EN/STI 7.1 Off line separator EN/STI 7.2 Separator areas EN/STI 7.3 Experiment Hall EN/MEF 7.4 Beam lines BE/ABP Steering Committee International Advisory Panel 8.1 Safety Coordinator GS/DI 3.1 Civil Engineering GS/SEM 3.2 Integration EN/MEF 3.3 Cooling ventilation EN/CV 3.9 Interlocks TE/MPE 4.4 Planning & Installation EN/MEF 4.5 Linac commissioning BE/RF-OP 1.1 Project Leader – Y. Kadi (EN/HDO) 1.2 Project Safety Coordinator – A.P. Bernardes 1.3 SC Linac Coordinator – W. Venturini BE/RF 1.4 Design Study Coordinator–R.Catherall EN/STI 1.7 Budget and Planning – E.Delachenal EN/GMS 1.8 Administration – A. Rasmussen EN/GMS CATHI Fellows represent 1/3 rd of the manpower deployed on the project 1.5 Installation Coordinator – E. Siesling BE/OP 1.6 Detailed Activity Planning – E. Siesling BE/OP
15
Mid Term Review Meeting, 26 September 201215 Co-ordinator’s Report Outline The ISOLDE Facility and it’s upgrade: HIE-ISOLDE CATHI and HIE-ISOLDE Scientific Overview Networking Administrative & Management Issues Conclusions and Prospects
16
Mid Term Review Meeting, 26 September 201216 Co-ordinator’s Report Scientific Highlights (1/9)
17
Mid Term Review Meeting, 26 September 201217 Co-ordinator’s Report Key Technologies
18
Mid Term Review Meeting, 26 September 201218 Co-ordinator’s Report Scientific Highlights (2/9)
19
Mid Term Review Meeting, 26 September 201219 Co-ordinator’s Report HIE-ISOLDE Diagnostic Box
20
Mid Term Review Meeting, 26 September 201220 Co-ordinator’s Report Scientific Highlights (3/9)
21
Mid Term Review Meeting, 26 September 201221 Co-ordinator’s Report Linac & HEBT Magnets
22
Mid Term Review Meeting, 26 September 201222 Co-ordinator’s Report Scientific Highlights (4/9)
23
Mid Term Review Meeting, 26 September 201223 Co-ordinator’s Report Integration Studies Transport zone Large dipole EPC racks Cable trays Collision s
24
Mid Term Review Meeting, 26 September 201224 Co-ordinator’s Report Novel alignment monitoring system http://alignment.hep.brandeis.edu/ Features: Allows almost continuous monitoring of the position of cavities and solenoids Allow reconstruction of positions of cold elements in the whole linac (not limited to a single cryomodule) Radiation resistant and … It’s affordable
25
Mid Term Review Meeting, 26 September 201225 Co-ordinator’s Report Scientific Highlights (5/9)
26
Mid Term Review Meeting, 26 September 201226 Co-ordinator’s Report Scientific Highlights (6/9)
27
Mid Term Review Meeting, 26 September 201227 Co-ordinator’s Report Target and Front-End Design Issues to be addressed Targets Target lifetime, material science, ion source optimization, geometry, energy deposition, handling, elimination pathway. Front Ends Material resistance, maintenance, optics, vacuum systems, remote operation… Starting point Fluka simulation of induced radiation Necessary for both Design Study and High Energy project Will provide input for shielding studies
28
Mid Term Review Meeting, 26 September 201228 Co-ordinator’s Report Scientific Highlights (7/9)
29
Mid Term Review Meeting, 26 September 201229 Co-ordinator’s Report Cooling and Ventilation System Issues to be addressed Air activation Separation of ventilation systems Separation of ventilated zones Activated cooling water
30
Mid Term Review Meeting, 26 September 201230 Co-ordinator’s Report Scientific Highlights (8/9)
31
Mid Term Review Meeting, 26 September 201231 Co-ordinator’s Report New HRS Layout Special field shaping quads
32
Mid Term Review Meeting, 26 September 201232 Co-ordinator’s Report Scientific Highlights (9/9)
33
Mid Term Review Meeting, 26 September 201233 Co-ordinator’s Report Construction Phase Shielding RF cavities and secondary beam shieldings to be defined Radiation levels impact on existing and new facilities
34
Mid Term Review Meeting, 26 September 201234 Co-ordinator’s Report Scientific Overview More details will follow in the individual presentations of the CATHI fellows What’s next: More on writing up specifications, production follow-up, installation and tests Emphasis on secondment at associated partners Publications and conferences
35
Mid Term Review Meeting, 26 September 201235 Co-ordinator’s Report TRAINING Hands-on research training complemented by formal training: CERN Training Programmes Academic Training CERN Seminars CERN Accelerator School Technical Training International Conferences LINAC, IPAC, SRF, ICIS, EMIS, RNB, IEEE Real- Time……… Training during secondment Up to 30% of contract duration Complementary Training CERN Management and Communication courses Other external training courses
36
Mid Term Review Meeting, 26 September 201236 Co-ordinator’s Report Outline The ISOLDE Facility and it’s upgrade: HIE-ISOLDE CATHI and HIE-ISOLDE Scientific Overview Networking Administrative & Management Issues Conclusions and Prospects
37
Mid Term Review Meeting, 26 September 201237 Co-ordinator’s Report WORKING TOGETHER (1/2) CATHI partners Pre-existing relationships and/or collaborations CERN services tailored to support international collaborations EU funding covers People: Researcher salaries + social conditions Training & Mobility ITN Management Organization of workshops, conferences It does not cover research project costs That’s why CATHI research programmes have been integrated into approved HIE-ISOLDE project
38
Mid Term Review Meeting, 26 September 201238 Co-ordinator’s Report WORKING TOGETHER (2/2) Supervisory Board (once per year) Approve and oversee implementation of training programme for scientific, technical and complementary skills; Co-ordination of the network-wide training activities; Monitor/evaluate overall progress of research training program; Management Committee (At least twice per year) Overall management of research programme; Implement training activities with associated partners; Management & follow-up progress of the individual projects; Organization network-wide training (courses, workshops, etc); Overview integration of Researchers into research team(s); Review of the Personal Career Development Plans; Dissemination of best practice and project results. Sharing information Use of SharePoint tool ( https://espace.cern.ch/Marie-Curie-CATHI/default.aspx ) Deliverables 1. Annual S&T and management/financial reports 2. Prepare workshops & training events Supervisory Board (coordinator +MCSC chair +HR) Assoc. partners invited Management Committee Coordinator Work Package Leaders (Assoc partners invited) Administrative unit CERN HR and FI Departments Selection Committee
39
Mid Term Review Meeting, 26 September 201239 Co-ordinator’s Report List of Participants
40
Mid Term Review Meeting, 26 September 201240 Co-ordinator’s Report New Associated Partners
41
Mid Term Review Meeting, 26 September 201241 Co-ordinator’s Report Outline The ISOLDE Facility and it’s upgrade: HIE-ISOLDE CATHI and HIE-ISOLDE Scientific Overview Networking Administrative & Management Issues Conclusions and Prospects
42
Mid Term Review Meeting, 26 September 201242 Co-ordinator’s Report Recruitment of Fellows: Time plan
43
Mid Term Review Meeting, 26 September 201243 Co-ordinator’s Report Administrative & Management Issues There are no deviations from the original contract In the process of re-scheduling the secondment period (new partners, late recruitment, etc…) Given the difficulty in recruiting ER1, task was covered by CERN staff => we may consider re-orienting ER1 future candidate on cavity and cryomodule test 3 ESRs enrolled on a PhD programme. More information will be provided by Seamus Hegarty next…
44
Mid Term Review Meeting, 26 September 201244 Co-ordinator’s Report Conclusions The presence of the CATHI fellows is paramount for the HIE- ISOLDE project: Replace missing staff deployed on other high-priority projects (LS1, LHC Upgrade, L4, LIU, etc…) Represent 1/3 rd of the total manpower of the project and almost 2/3 rd in the case of the Design Study ! Help establish or re-inforce existing collaborations Keep up with the pace – maintain this good spirit and teamwork
45
Mid Term Review Meeting, 26 September 201245 Thank you very much for your attention HIE-ISOLDE web site -> http://hie-isolde.web.cern.ch/hie-isolde/ CATHI-ITN web site -> https://espace.cern.ch/Marie-Curie-CATHI/default.aspx