GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope: Mechanical Systems Peer Review March 27, 2003 Section 5.3 – Fabrication & Assembly Plans Bill Olson SLAC Mechanical Engineer marcc@slac.stanford.edu Gamma-ray Large Area Space Telescope
2
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 2 Topics Agenda Procurement plans –Identify critical component need dates vs. delivery dates –Summarize procurement contract status –Long lead part requirement/procurement Fabrication plans –Mech Parts and Materials plan –Material approval status/readiness Assembly plans –Assembly sequence MGSE Performance and Safety Assurance plans Further Work
3
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 3 Procurement Plans RFP for 4 x 4 Grid & Grid Box Machining –Issue by 4/21/03 –Place contract by 5/15/03 Long Lead Materials –PR for 2 Grid billets is in process now –Lockheed has ordered heat pipe extrusions
4
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 4 Mechanical Parts & Materials Plan Material requirements flow down from the Mission Assurance Requirements 433-MAR-0001 and the Mechanical Parts Plan LAT-SS- 00107-01. LAT Material selection of low outgassing and flight heritage Outgassing specs: TML < 1% CVCM < 0.1% Important Procedures and Guidelines for Material selection Fastener Integrity Requirements (541-PG-8072.1.2) Metallic Materials for Stress Corrosion Cracking Resistance in Sodium Chloride Environment (MSFC-STD-3029) Standard Test Method for Total Mass Loss and Collected Volatile Condensable Materials for Outgassing (ASTM-E-595)
5
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 5 Mechanical Parts & Material: Status Submitted to SLAC IPO as of 3/19/03
6
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 6 Grid Box Assembly Overview Accepted Hardware Test activity Assembly activity Legend X-LAT Plates Heat Pipe Patch Panels Radiator Mount Bracket Grid Ready for Test Grid Box Base Assy Grid Assy Grid Box Assembly Configuration Grid Box Assy Heat Pipes Purge Groove Cover EMI Skirt Details CAL Plates (Temporary) Spacecraft Interface (Wing)
7
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 7 Grid Assembly The Grid Assembly consists of; 4 x 4 Grid Spacecraft mounting interface (Wing) which is located at the bottom center of each side of the Grid Radiator Mounting Brackets - 2 as shown and 2 opposite. Radiator Mounting Bracket Grid Assembly
8
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 8 Grid Box Base Assembly The Grid Box Base Assembly is the next level assembly, and is the configuration delivered to I&T. It consists of: Grid Assembly Heat Pipe Patch Panels, 2 as shown and 2 opposite Heat Pipes –5 Top Flange Heat Pipes (TFHP) –12 Downspout Heat Pipes (DSHP) 2 Purge groove covers Flight heaters, thermostats & thermistors on Grid Once this assembly is put together, it is not intended to be taken apart. Heat Pipe Patch Panel Grid Box Base Assembly
9
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 9 Grid Box Assembly The Grid Box Assembly is the Mechanical Systems’ top assembly test configuration. It consists of: Grid Box Base Assembly Remaining EMI skirt parts –4 Center EMI Shields –X-EMI Shields, 2 as shown and 2 opposite 2 X-LAT plates with heat pipes X-LAT Mid-plate 16 Temporary Calorimeter plates. Center EMI Shield X-EMI Shield Grid Box Assembly
10
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 10 Grid Fabrication Plan The Grid is a complex machined part that requires special consideration and handling. Tapemation outlined their plan, which basically is; Rough mill, leaving approximately 0.200” extra all around Heat treat to remove stresses and temper to T6 condition Face Datum-A and the opposite side to 0.100” away from the finished surfaces Mill all four sides to approximately +0.100” Stress relieve Finish mill inside (bay) features from Datum-A side Finish mill all four sides
11
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 11 Grid Fabrication Plan (Cont) Finish mill all features on side opposite Datum-A Finish drilling, tapping, and all other features on Datum-A side Finish mill Datum-A surface Deburr and clean part Inspection – Coordinate Measurement Machine (CMM) Alodine Install all inserts and hardware Perform proof load test on inserts Ready for Grid Box Machining.
12
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 12 Grid Fabrication Procure aluminum NDT plate (x-ray, UT, other) Test samples Inspect Grid Clean Grid Finish machine Grid Remove, mach test samples Stress-relieve heat treat Rough machine Grid Procure inserts, mount h’ware Repair as required Install inserts Proof inserts Fabrication activity Inspection/test Assembly activity Legend Grid Inserts Ready for Grid Box Machining Alodine Final Inspection SLAC Buy-off
13
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 13 Grid Box Machining Grid Box Machining is a temporary assembly for machining: –EMI shields coplanar for X-LAT plate mounting –Each pair of Radiator Mounting Brackets coplanar –Control relative positions of Radiator & X-LAT locating pins to Grid datum’s so 3 sets of heat pipes will mate properly Install the EMI Skirt components on Grid Machine bottom edges of the EMI Skirt components co-planer Machine X-LAT locating pin holes and fastener holes in the EMI Skirt components Machine mounting features & locating pins holes in Radiator Mounting Brackets Install locating pins and Helicoils Mark parts for specific location on Grid Radiator Pins X-LAT Pins
14
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 14 Grid Box Machining Procure aluminum Procure inserts, mount h’ware Fabrication activity Inspection/test Assembly activity Legend Grid Inserts Deliver To SLAC Machine X-EMI Shields Machine Center EMI Shields Machine Patch Panels Machine Radiator Brkts Clean EMI Skirt Components Inspect Repair as required Install inserts in EMI Skirt Parts Install Radiator Brkts, Patch Panels, Center EMI Shields, & X-EMI Shields on Grid Machine EMI Skirt Co-planer Drill Pin and Bolt Holes in EMI Skirt Parts & Radiator Brkts Machine Radiator mounting surface features in Radiator Brkts Clean Assy Inspect Repair as required EMI Skirt Grid Install inserts in EMI Skirt Parts
15
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 15 Grid Assembly Procedure The Grid Assembly is assembled per the following procedural steps: All components are inspected, cleaned, bagged, and staged when received. This is true for all components that make up the Grid Box Assembly Lay Grid top side down on a flat table Install Spacecraft wings Install the Radiator Mounting Brackets
16
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 16 Grid Box Base Assembly Procedure The Grid Box Base Assembly is the core assembly, and is not intended to be disassembled below this level. The procedural steps are; Leave the Grid Assembly top side down Install the Heat Pipe Patch Panels so the Downspout Heat Pipe mounting surfaces on the Grid and Patch Panels are co-planer Turn the Grid Assembly top side up Locate the Downspout Heat Pipes (DSHP) relative to Radiator locating pins with tool Bond the DSHPs to Grid Bond Grid Top Flange Heat Pipes into Grid Bond the Purge Groove Cover Plates. Install flight heaters, thermostats, & thermistors to Grid Wire heaters, thermostats, & thermistors Attach the Grid Perimeter Ring, which is for handling the LAT during all phases of operation, other than flight, to make handling the assemblies easier and safer.
17
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 17 Grid Box Assembly Procedure The Grid Box Assembly is the final assembly level for Mechanical Systems. The procedural steps for assembly are; Place the Grid Box Base Assembly top side down Install temporary Calorimeter plates Install the Center EMI Shields Install the X-EMI Shields Mount the X-LAT plates on the EMI Shields and fasten the heat pipes to the Patch Panels Mount the X-LAT Mid-plate on the EMI Shields.
18
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 18 Mechanical Systems MGSE
19
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 19 Performance Assurance System Mechanical Systems will comply with the following: –LAT Performance Assurance Implementation Plan (PAIP), LAT-MD-00039 –LAT Quality Manual, LAT-MD-00091 –Configuration Management Plan, LAT-MD-00068 –Instrument Performance Verification Plan, LAT-MD-00408 –Calibration Program, LAT-MD-00470 –System Safety Program Plan (SSPP), LAT-MD-00078 Additionally, above requirements have been flowed down to Suppliers and Subcontractors.
20
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 20 Further Work Finalize Wing design Finalize Spacecraft Mount configuration with Spectrum Optimize stress and mass of EMI Skirt components Detail design of assembly MGSE Get Grid vendor under contract
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.