Download presentation
Presentation is loading. Please wait.
Published byGyles Owen Modified over 9 years ago
1
BROWN SHRIMP MANAGEMENT PLAN Brown Shrimp Cooperative MSC Group NSAC Brown Shrimp Focus Group Utrecht, 19. January 2016 Danmark DeutschlandNederland
2
SUSTAINABLE FISHERY CO-MANAGED HIGH LONG-TERM YIELD MINIMIZED ECOSYSTEM EFFECTS
3
SUSTAINABLE FISHERY CO-MANAGED HIGH LONG- TERM YIELD MINIMIZED ECOSYSTEM EFFECTS SCIENTIFIC MONITORING OTHER STAKEHOLDERS STEERING GROUP INDEPENDENT CONTROL POs
4
SUSTAINABLE FISHERY CO-MANAGED HIGH LONG-TERM YIELD MINIMIZED ECOSYSTEM EFFECTS MESH SIZE 20 mm NO PULSE TRAWL LPUE BASED HCR ”MSY” PLAN MAY 2020 26 mm PRECAUTIONARY REFERENCE POINT: 72 HOURS CAPACITY CAP & 200 DAYS 10 m BEAM & 2 t GEAR
5
HIGH LONG-TERM YIELD MESH SIZE 20 mm NO PULSE TRAWL CAPACITY CAP & 200 DAYS LPUE BASED HCR 10 m BEAM & 2 t GEAR ”MSY” PLAN MAY 2016 22 mm MAY 2018 24 mm MAY 2020 26 mm CO-MANAGED SCIENTIFIC MONITORING
6
HIGH LONG-TERM YIELD MESH SIZE 20 mm NO PULSE TRAWL CAPACITY CAP 200 DAYS LPUE BASED HCR 10 m BEAM 2 t WEIGHT LIMIT REFERENCE POINT: 24 HOURS PRECAUTIONARY REFERENCE POINT: 72 HOURS
7
SUSTAINABLE FISHERY CO-MANAGED HIGH LONG-TERM YIELD MINIMIZED ECOSYSTEM EFFECTS DISCARD MEASURES REVIEW ETP LOGBOOK ALWAYS SIEVE NET/ GRID MAX 15 % SIEVAGE HABITAT EFFECTS MONITORING 6.8 mm SIEVE WASTE & OIL HANDLING
8
SUSTAINABLE FISHERY CO-MANAGED HIGH LONG-TERM YIELD MINIMIZED ECOSYSTEM EFFECTS DISCARD MEASURES REVIEW ETP LOGBOOK ALWAYS SIEVE NET/ GRID MESH SIZE 20 mm ”MSY” PLAN MAY 2016 22 mm MAY 2018 24 mm MAY 2020 26 mm MAX 15 % SIEVAGE HABITAT EFFECTS MONITORING 6.8 mm SIEVE WASTE & OIL HANDLING
9
SUSTAINABLE FISHERY CO-MANAGED HIGH LONG- TERM YIELD MINIMIZED ECOSYSTEM EFFECTS SCIENTIFIC MONITORING OTHER STAKEHOLDERS STEERING GROUP INDEPENDENT CONTROL POs ”MSY” PLAN LPUE BASED HCR DISCARD MEASURES REVIEW
10
SUSTAINABLE FISHERY CO-MANAGED HIGH LONG-TERM YIELD MINIMIZED ECOSYSTEM EFFECTS SCIENTIFIC MONITORING OTHER STAKEHOLDERS STEERING GROUP INDEPENDENT CONTROL POs
11
SUSTAINABLE FISHERY CO-MANAGED HIGH LONG-TERM YIELD MINIMIZED ECOSYSTEM EFFECTS PUBLIC MANAGEMENT
12
THE END? NO, THE BEGINNING! Danmark DeutschlandNederland
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.