Download presentation
Presentation is loading. Please wait.
Published byMervin Watts Modified over 8 years ago
1
2010 © European Aviation Safety Agency European Aviation Safety Agency Frank Manuhutu Chief Legal Adviser, EASA Recent developments in the work of EASA
2
2010 © European Aviation Safety Agency 2 EASA Overview Regulation (EC) No 1108 / 2009 Initial First extension Second extension R 1592/02 entered into force 28 September 2003 R 216/08 repealing R 1592/02 entered into force 8 April 2008 R 1108/09 amending R 216/08 entered into force 14 December 2009
3
2010 © European Aviation Safety Agency 3 2. Implementing measures (1 st ext.)
4
2010 © European Aviation Safety Agency 4 2. Implementing measures (2 nd ext.) Second extension (ADR) ADR: Rulemaking Task started in August 2010 »ADR.001 Requirements for ADR operator organisations and competent authorities »ADR.002 Requirements for ADR operations »ADR.003 Requirements for ADR design NPA expected Q1 / 2012 Future ADR Rulemaking tasks: »ADR.X Apron Management Service »ADR.Y Aerodrome Equipment (with ATM) »ADR.Z Heliports http://www.easa.europa.eu/atm/npas-aerodromes.html
5
2010 © European Aviation Safety Agency 5 Drafting 2010 Q1 Q3Q22011 Opinions SES Committee information events 2010 Q3Q22011 ATM/ANS and ATCO Opinion 2010/02: ATM.001 & ATM.004 Opinion 2010/03: ATM.003 http://www.easa.europa.eu/atm/npas-atm-ans.html ATM Conference 24 June in Cologne Comitology & adoption - by 2011 2. Implementing measures (2 nd ext.)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.