LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015
2
Overview LHC 8:30 meeting2 Fill 3911: 372 b. in both beams 24 bunches per injection
3
Overview LHC 8:30 meeting3 Fill 3912: 24 bunches per injection Lost sector 23 (5h stop)
4
Overview LHC 8:30 meeting4 Fill 3914 372b. in B1 588b. in B2 Tested injections of 36b. OK Tested injections of 48b. dumped by injection losses increased scraping at SPS
5
Overview LHC 8:30 meeting5 Fill 3914 372b. in B1 588b. in B2 Tested injections of 36b. OK Tested injections of 48b. dumped by injection losses increased scraping at SPS
6
Overview LHC 8:30 meeting6 Fill 3915 Test with 48b. per injection Unstable in both planes Roll back to 36b. per injection
7
LHC 8:30 meeting7
8
Overview LHC 8:30 meeting8 Fill 3416 36b. per injection Dumped B1 soon after first injections of B2, interlocked BPM
9
Overview LHC 8:30 meeting9 Fill 3417 Test with 48b. @0.9e11 Stability does not improve
10
Overview LHC 8:30 meeting10 Fill 3418-19-20-21-22 36b. per injection Reached up to ~200-300b Mainly dumped by V instability but anyway strong beam degradation when kept
11
Overview LHC 8:30 meeting11 Fill 3425 Injected 228b. in B1, 210b. in B2 Kept in the machine in spite of the decreasing heat load due to PS extraction problem
12
Overview LHC 8:30 meeting12 Fill 3425 Injected 228b. in B1, 210b. in B2 Kept in the machine in spite of the decreasing heat load due to PS extraction problem
13
Overview LHC 8:30 meeting13
14
Both MKIs condition well 25ns Start lower: NEG coating in Cu tube
15
Comparison with 2012 after MKI exchange during TS 25ns Start lower: NEG coating in Cu tube Start lower: NEG coating in Cu tube 25ns After MKI8D exchange 2012
16
Summary o Continued scrubbing with 25 ns beams o Operation with 25 ns still looks very challenging at this stage For trains of 24b+ instabilities right after injection are observed and often lead to beam dumps for trains of 36b+ (even with extremely high Q’) When enough beam is stored, strong heat load is observed in the arcs Very poor lifetime can be improved by trimming down chroma at store o Scrubbing evolution is observable but the pace is quite slow Slower than in 2011-12 much more difficult to keep long trains in the LHC o To speed up the process, a better control of the instability is desirable Any optimization possible on ADT side? o Possible next steps: Accumulate more beam dose with 25 ns before switching back tomorrow to 50 ns to complete the intensity ramp up (benefiting from the 48h scrubbing with 25 ns) LHC 8:30 meeting16