Download presentation
Presentation is loading. Please wait.
Published byMargaret McDowell Modified over 8 years ago
1
doc.: IEEE 802.15-04/241r4 Submission November 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted: [16 November 2004] Source: [Reed Fisher] Company [Oki Electric Industry Co., Ltd.] Address [2514E. Maddox Rd. Buford, GA 30519,USA] Voice:[+1-770-271-0529] E-Mail:[reedfisher@juno.com] Re : [] Abstract:[Description of SG3c Project Timeline] Purpose:[ Development of SG3c work plan] Notice :This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.
2
doc.: IEEE 802.15-04/241r4 Submission November 2004 Reed Fisher Oki Electric IndustrySlide 2 IEEE 802.15.SG3c Project Work Plan May 04 –Develop SG work plan –Begin discussion of PAR & 5C –Draft Call For Applications (CFA) June 04 –Issue of official CFA July 04 –Hear responses to CFA –Begin characterization of applications –Begin work on system requirements –Continue discussion of PAR & 5C –New contributions September 04 –Hear responses to CFA –Derive Application Requirements from CFA –Continue discussion / drafting on PAR & 5C –Begin work of channel model Sub-Study Group (SSG) November 04 –Heard the third response to CFA –Submitted PAR & 5 Criteria to the 802.15 WG –Motion to have PAR & 5C adopted to form Task Group –Discussion on Technical Requirements –Continue channel model SSG activities January 05 –Continue discussion on Technical Requirements –Continue channel model SSG activities March 05 –Continue discussion on Technical Requirements –Continue channel model SSG activities –Motion to elevate to TG
3
doc.: IEEE 802.15-04/241r4 Submission November 2004 Reed Fisher Oki Electric IndustrySlide 3 IEEE 802.15.SG3c Project Timeline 20042005 May Interim JuneJuly Plenary September Interim November Plenary January Interim March Plenary Work Plan Issue CFA Hear CFA responses Application Requirement Develop PAR & 5Criteria Technical Requirement / Selection Criteria Channel Model Definition Motion SG to TG SGTG Draft CFA Revision
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.