Download presentation
Presentation is loading. Please wait.
Published byEric Sparks Modified over 8 years ago
1
Higher Speed Rail: How Soon? Key Regulatory & Transactional Issues Kevin M. Sheys kevin.sheys@klgates.com
2
1 Higher Speed Rail: How Soon? Overview Regulatory Issues Transaction Issues
3
2 Higher Speed Rail: How Soon? Regulatory Issues: Funding Must Read – High Speed Intercity Passenger Rail Program Notice June 23, 2009. http://www.fra.dot.gov/Downloads/RRDev/fr_hsipr_gu idance.pdf http://www.fra.dot.gov/Downloads/RRDev/fr_hsipr_gu idance.pdf Regulatory Issues: Funding Must Read – High Speed Intercity Passenger Rail Program Notice June 23, 2009. http://www.fra.dot.gov/Downloads/RRDev/fr_hsipr_gu idance.pdf http://www.fra.dot.gov/Downloads/RRDev/fr_hsipr_gu idance.pdf
4
3 Higher Speed Rail: How Soon? Regulatory Issues: Safety Convergence of track and passenger equipment standards – systems approach to the interaction between vehicle types and track conditions Positive train control rule, with performance requirements tiered to speed limits, by the end of October 2009
5
4 Higher Speed Rail: How Soon? Regulatory Issues: Safety Grade crossings – implementation of a policy requiring no at-grade crossings at speeds above 125 mph, full width barriers at speeds above 110 mph and four-quad gates at speeds above 80 mph Tiered equipment structural standards Must Read – High-Speed Passenger Rail Safety Strategy: Discussion Draft for Public Outreach July 24, 2009.
6
5 Higher Speed Rail: How Soon? Transaction Issues: Public Private Partnerships Issues are not that different than other transportation projects: Risk allocation State laws Must Read – SNCF Responses to the FRA RFEI on operation of high speed rail in the U.S.
7
6 Higher Speed Rail: How Soon? Transaction Issues: Allocation of Tort Liability In a word? – settled “But-for” liability on the passenger carrier is standard on all new shared use and shared right of way arrangements
8
7 Higher Speed Rail: How Soon? Transaction Issues: Unanticipated Tax Issue On passenger-freight shared track conventional and emerging service (i.e., with maximum speeds below 110 mph) Will the freight railroads face tax liability from the massive capital improvements to their property made possible because of ARRA funding?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.