Presentation is loading. Please wait.

Presentation is loading. Please wait.

First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.

Similar presentations


Presentation on theme: "First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015."— Presentation transcript:

1 First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015

2 Introduction/Outline Overview of facility Recent Accomplishments –Electrons through Injector –preliminary results –CM-2 Future Prospects Summary 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator2

3 Overview of Facility Photoinjector Gun –Normal conducting 1-1/2 cell Laser –infrared > green > ultraviolet Capture Cavities –1 installed –another being prepped for installation User line including chicane 22.5° down bend to Beam Absorber 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator3

4 Recent Accomplishments – Electrons First accelerated electrons to beam absorber on 27 March –<2 days of tuning Regular operation since 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator4

5 Recent Accomplishments – Electrons Typical Operating Parameters –Laser spot size =  H = 235  m,  V = 187  m –pC/bunch = 250 typical, peak single bunch peak = 1 nC –# Bunches = 20 - 60 –Gun voltage = 42 MV (4.5 MeV) –CC2 voltage = 15 MV/m –Transmission to beam absorber = 100% (22 meters) 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator5

6 Recent Accomplishments – Electrons Current Activities –commission Machine Protection System –center beam through quadrupoles –commission diagnostics BPM’s streak camera profile monitors –verify lattice/machine parameters 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator6 YAG screen image at end of line

7 Preliminary results – CC2 Transfer Function Measurement 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator7 Analysis in progress BPM’s before CC2 BPM’s after CC2

8 Preliminary results – Energy and Dispersion 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator8 Beam Energy [MeV] = 0.03 x (N:D122FF [Gauss]) x 0.2636 / sin(22.41Deg) = N:D122CE Beam centroid at end of line Beam width at end of line Fixed Angle No steering through quads E ~20 MeV

9 Preliminary results – Energy and Dispersion Cont. 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator9 D = -248.0 mm

10 Preliminary results – Cathode QE Scan 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator10 1 nC/bunch QE ~2.5%

11 Preliminary results – CC2 Phase Scan – Ceramic Gap 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator11 Ceramic Gap is sensed with a self-calibrating 30 GHz  wave horn indication of off-crest bunch narrowing? more study needed CC2 phase intensity at ceramic gap  wave diode response CC2 crest

12 Preliminary results – CC2 Phase Scan with varied charge 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator12 CC2 +7° off-crest CC2 on-crest CC2 -7° off-crest Charge from Photoinjector Beam Centroid at beam absorber (after spectrometer) indication of charge-dependent energy variation charge-dependence varies with CC2 phase charge-dependent loss mechanism e.g. synchrotron light? more study needed

13 Recent Accomplishments – CM-2 CM-2 has achieved an average cavity gradient of 31.5 MV/m with all 8 cavities powered simultaneously 1.6 millisecond pulse width, 5 Hz repetition rate Lorentz Force Detuning Compensation (LFDC) on and ‘adapting’ LLRF operated in ‘closed loop’ Peak accelerating voltage = 252 MV Cavity 8 Warm coupler vacuum problem repaired in situ –required warm-up to room temperature Successful cool down and resumption of operation 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator13

14 Recent Accomplishments – CM-2 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator14 Snapshot of cavity gradients 31.5 MV/m CM2 Amplitude (MV/m, left) & Phase (right)

15 Future Prospects Increase intensity Commission chicane (compressed bunches) –coherent diffraction radiation –micro-bunch detection Single crystal channeling experiment Install CC1 – up to 55 MeV final energy Beam through cryomodule –tunnel extension –beam line –etc. 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator15

16 Summary ASTA is now operational at 20 MeV Commissioning activities in progress Increased energy after CC1 is installed: up to 55 MeV CM-2 met 31.5 MV/m specification Beam through cryomodule in 2017 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator16 thanks to Fermilab IOTA/ASTA group, especially Dan Broemmelsiek and Chip Edstrom, for information and beam results

17 Thank You for your attention Questions? 4/24/15E. Harms | First electrons at the Fermilab SRF test accelerator17


Download ppt "First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015."

Similar presentations


Ads by Google