Chiller + Brine + Water control system UNICOS CPC6 19.01.2012 Lukasz Zwalinski – PH/DT
2
System architecture - option with 1 CPUSystem architecture - option with 1 CPU and backplane extension Ring topology M340 with Multi-Port Module BrineThermosiphon ETHERNET IP surface Brine OWS DIP Distributed I/|O Chiller 2 back plane extension CPU + I/O cardsI/O cards Chiller 1Water I/O cards back plane extension 1 CPU and backplane extension: + 1 PVSS data server + no need to build up software communication + simple ! ~ 800 I/O
3
PVSS panels - COMMANDS
4
PVSS panels
5
Right click
6
PVSS panels Double click
7
PVSS panels - ALARMS
8
PVSS panels – Alarms types Digital Alarms Analog Alarms
9
PVSS panels – Alarm list
10
PVSS panels COMMANDS Vertical panel navigation Push button opens popup panel
11
PVSS panels chiller operation mode selection Vertical panel navigation
12
PVSS panels - R404 stepper
13
PVSS panels - R23 stepper
14
PVSS panels - R404
15
PVSS panels COMPRESSOR ANADO object
16
Chiller - alarms Compressor alarms EHT alarms
17
PVSS panels - R23
18
PVSS panels - Water
19
PVSS panels - Brine
20
PVSS panels - Thermosiphon
21
PVSS panels - compressed air diagnostic
22
PLC Ethernet connection in SX1
23
To clarify - touch screen BIG misunderstanding! We have asked J&E HALL to install graphic color 7.5”, type XBTGT4230 Schneider EN/ICE CPC 6 solution for touch panels Touch Panel: For sure we will not develop a UNICOS for the Schneider Touch Panel. You have to change this touch panel to a Siemens Touch Panel series working with WinCC Flexible.
24
Visit to J&E Haal 11-12.01.2012 19.01.2012 Lukasz Zwalinski – PH/DT
25
Status
30
PLC hardware configuration Installed Bought To order PVSS data server ordered in ICE last year
31
TESTs Private Ethernet network …. Logic tests: -Compressor steppers (R404, R23) -Operation modes selections, swaps,… -Object dependent logic (EV53003, EV53007, Comp59502, CV59201, CV59202, CV59213,…) -Controllers direction verification Preliminary I/O test - Connecting SCADA + PLC + Chiller1 using back plane extension -Testing 2 signals on each Telefast module (verification PVSS->PLC mapping, PLC->I/O mapping) TT59211, PT59236, AISpare08, …
32
STATUS Current project status: I/O for all project Brine+Water+Chiller1+Chiller2 (~800) Logic for Chiller 1 (95%) Alarms and interlocks for Brine+Water+Chiller1+Chiller2 To do: Recipes Continue logic tests once PLC will be back from UK Brine and Water logic to be programmed Touch panel programming Communication to Thermosiphon PLC