Download presentation
Presentation is loading. Please wait.
Published byClarence Berry Modified over 8 years ago
1
TST WG Status Report to TP #21 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: 2016-01-18 to 2016-01-22 Agenda Item: TP21, Item 10, Reports from Working Groups TP-2016-0030R01-TST_status_report_to_TP_21
2
Issues for DECISION in TP 2 Approval of TS-0013 and TR-0025 as part of Release 1 Rattification of TS-0013 and TR-0025 prior to publication by the PT1s – TP-2016-0033-request_for_approval_of_TS-0013 – TP-2016-0034-request_for_approval_of_TR-0025
3
Issues for REQUEST in TP 3 In order to develop Test Cases (using TTCN-3), TST WG requires a repository. GitLab (github-like, can be hosted locally, provides same functionality but more intuitive, easier, user friendly) As TST WG will start work on developing test cases (as part of TS-0019), the repository is required ASAP. TST WG requests TP to approve this so that FC will discuss this.
4
Items for INFORMATION TTA and ETSI propose to co-organize the 2 nd consecutive oneM2M Interop. test event. Time: A week before TP#23 from Tuesday afternoon (10.May) to Friday (13.May) 3 days and half Location: TTA, Seongnam-city, Korea (close to Seoul, 20 mins) Scope: Test specification: TS-0013 TS-0001, 0004, 0008, 0009 and 0010: The recommended specs. Version will be notified 1 month earlier at least. Conformance Testing Tool Demo (if available) ASK MARCOM and each SDO advertise this actively TP-2016-0030 4
5
Items for INFORMATION TP-2015-0834 5 TP23 TP22TP21 53111 -Online registration -NDA sign -Organizing test sessions - To Update and be stable Spec Preparing official report in TP Interop Follow ups after the event Test Event TP20 Start to discuss 2 nd event Announcement in TP21
6
Items for INFORMATION Meeting objectives summary Testing requirements analysis (derivation, annotation, etc.) DONE Managing TS/TR DONE Discussion on certification DONE SC Certification Ad-Hoc Date: 28 th. January. 2016 https://attendee.gotowebinar.com/register/49507 12004452833538 TP-2015-0834 6
7
Next Steps TP-2015-0834 7 TP #21 2016.01 TP #20 2015.11 TP #23 2016.05 TP #22 2016.03 TP #25 2016.10 TP #24 2016.07 Initial development Reqs. annotation and collection Part TPs development Extend TPs and reassessment Reqs and core TPs 2 nd Interop 3 rd Interop TTCN-3 for small set of TPs Develop TTCN-3 TTCN-3 structure Interop. testing Rel-2 Interop. spec.
8
Action Items Status #Action Item DescriptionOwnerStatus A-WG6-TP20-001Test related requirements analysisMiguel Angel Reina Ortega ONGOING A-WG6-TP20-002Prepare the updated TS-0013 and TR-0025 Laurent VelezDONE A-WG6-TP20-003Prepare 2 nd Interop. test eventSookhyun JeonONGOING A-WG6-TP21-001TP developmentVolunteersSTARTED A-WG6-TP21-002Testing env. & system tutorialRichardSTARTED A-WG6-TP21-003TTCN-3 developmentMiguel Angel Reina Ortega STARTED A-WG6-TP21-004Plan for Rel-2 interop. specLaurent VelezSTARTED TP-2015-0834 8
9
Next Meetings / Calls Conference Calls – TST#21.1: 2016-Feb-2, UTC 13:00-15:00 – TST#21.2: 2016-Feb-23, UTC 13:00-15:00 Face-to-Face – TST#22.0: March 14-18, EU – TST#23.0: May 16-20, Seoul, Korea TP-2015-0834 9
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.