Presentation is loading. Please wait.

Presentation is loading. Please wait.

US Army Corps of Engineers BUILDING STRONG ® Corps Reservoirs Elizabeth Nelsen and Brian Johnson Hydraulic Engineers 29 Mar, 2012.

Similar presentations


Presentation on theme: "US Army Corps of Engineers BUILDING STRONG ® Corps Reservoirs Elizabeth Nelsen and Brian Johnson Hydraulic Engineers 29 Mar, 2012."— Presentation transcript:

1 US Army Corps of Engineers BUILDING STRONG ® Corps Reservoirs Elizabeth Nelsen and Brian Johnson Hydraulic Engineers 29 Mar, 2012

2 BUILDING STRONG ® Red River of the North Breckenridge, MN Moorhead, MN East Grand Forks, MN City No needed.  All reservoirs are at conservation.  Red Lake’s inflow is greater than normal, the rest of the reservoirs are outflow = inflow.

3 BUILDING STRONG ® Minnesota River  Highway 75 and Marsh Lake are at conservation.  Lac qui Parle is half a foot above conservation until June 1.  Outflow = Inflow.

4 BUILDING STRONG ® Headwaters of the Mississippi No needed. City Bemidji, MN Aitkin, MN Brainerd, MN St. Paul, MN Lock 1 Lock 2 SAF Gull Cross/Pine Sandy Pokegama Winnibigoshish Leech


Download ppt "US Army Corps of Engineers BUILDING STRONG ® Corps Reservoirs Elizabeth Nelsen and Brian Johnson Hydraulic Engineers 29 Mar, 2012."

Similar presentations


Ads by Google