Download presentation
Presentation is loading. Please wait.
Published byAlexina Hart Modified over 9 years ago
1
Bruno Altieri 21-22 Jan. 2009 http://herschel.esac.esa.int/http://herschel.esac.esa.int/ # 1 Parallel mode Bruno Altieri (HSC) PACS PV phase review MPE, January 2008
2
Bruno Altieri 21-22 Jan. 2009 http://herschel.esac.esa.int/http://herschel.esac.esa.int/ # 2 Parallel mode AOT validation Check-out and scientific validation of parallel mode –also optimization of certain AOT parameters that could not be optimised on-ground –investigates best internal cal. strategy wrt stability of measurement conditions. About one OD planned so far, compared to the currently 6 ODs allocated in total. SPIRE may schedule some more observations –Still we shall not fill ODs for the sake of filling. Targets: –Fiducial stars for photometry consistency checks and PSF –NGC 6946 : large extended galaxy –Hi-GAL field: galactic plane field –Draco Cloud : highly structured field –XMM-LSS : cosmological field
3
Bruno Altieri 21-22 Jan. 2009 http://herschel.esac.esa.int/http://herschel.esac.esa.int/ # 3 Parallel mode AOT validation
4
Bruno Altieri 21-22 Jan. 2009 http://herschel.esac.esa.int/http://herschel.esac.esa.int/ # 4 SOVT2 Parallel mode observations 4 observations in SOVT2 –OD60 3221226234 : PACS products were not ingested as something failed during the processing. Therefore, no PACS products 3221226235 : OK –OD64 3221226655 same as 3221226234 3221226654 both instruments were ingested. –In this case and due to the "known problem" which is related to "versioning", queries by obsid only provides SPIRE products. –If you want also the PACS ones the work around is making the query by another metadata, for instance target? or ra,dec? To be tried !
5
Bruno Altieri 21-22 Jan. 2009 http://herschel.esac.esa.int/http://herschel.esac.esa.int/ # 5 Projection issue AssignRaDec ra/dec : OK photProject: not OK
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.