1
ELENA KICKERS AND SEPTA ELENA Meeting, 28.09.2011 Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT
2
Contents Introduction: TE/ABT equipment Septa Kickers ELENA Meeting 28.09.2011L. Sermeus 1
3
TE/ABT equipment TE/ABT equipment ELENA Meeting 28.09.2011L. Sermeus 2 ELENA (new) 2 septa 2 (+1 foreseen) kickers AD (existing) 8 kicker systems 2 septa ELENA Ring
4
Septa ELENA Meeting 28.09.2011L. Sermeus 3 What’s already available? SM12 # magnets2 # spare coils0 Gap width134mm Gap height74mm Septum thickness 22.8mm L physical 400mm L eq 300mm B0B0 679mT ∫B.dl max 204mT.m I max (DC)2000A
5
Septa ELENA Meeting 28.09.2011L. Sermeus 4 What’s needed? Mechanical support Water cooling manifold gauges, flow meters, filters and valves Magnet protection interlock system What’s needed, but not included? Vacuum chambers (TE/VSC?) Power supplies (TE/EPC?)
6
Septa ELENA Meeting 28.09.2011L. Sermeus 5 Resource requirements and what can collaborations contribute to? Magnetic septaTotal resource needs Mechanics, hydraulics45kCHF Interlock system, PLC’s30kCHF Total for both magnetic septa75kCHF Manpower estimate CERN ABT staff Collaboration contribution Total resource estimate Scientific staff0.1 m.y Technicians0.10.20.3m.y Controls technician0.10.20.3m.y Mechanics00.3 m.y Total manpower0.30.71.0m.y
7
Kickers ELENA Meeting 28.09.2011L. Sermeus 6 Features: ELENA and AD kicker system layout SF 6 Gas filled Pulse Forming Line PFL voltage up to 80 kV Thyratron switches use of oil for cooling and insulation 10 systems: 2 for ELENA and 8 for AD (+space for 2 new spares for future needs like second Elena extraction line)
8
Kicker generators relocation ELENA Meeting 28.09.2011L. Sermeus 7 Option 1 least preferred (space needed for future experiences) Option 2 most preferred but technically difficult and exposed to radiations Option 3 second most preferred to be studied Present kicker platform (10 generators) Option 4 least preferred (above racks)
9
Kicker magnets and tanks 3D models of magnets to be made with Catia software. Two new magnet frames made of stainless steel to be manufactured for 300 °C bake- out.(ex AC magnets only) Magnets to be dismounted and reassembled with new frame. (ex AC magnets only) Two (identical ?) 300 °C bake-able vacuum tanks and ancillaries to be designed, manufactured, equipped and tested. ELENA Meeting 28.09.2011L. Sermeus 8 Basic assumption: use of existing unused AC ejection or AA injection magnet modules (to be confirmed by P. Belochitskii) AC magnet AA magnet
10
Kicker magnets and tanks ELENA Meeting 28.09.2011L. Sermeus 9 Resource requirements and what can collaborations contribute to? ELENA kickers (*)Total resource estimate Magnet modifications40kCHF Vacuum tanks and ancillaries276kCHF HV and LV cables24kCHF Thyratrons80kCHF HV generator upgrade100kCHF Fluids50kCHF Total for 2 kickers570kCHF Manpower estimate (*) CERN ABT staff Collaboration contribution Total resource estimate Scientific staff0.5 m.y Technical assistant0.5 m.y Technician11m.y (Electro)Mechanic0.5 m.y Draughtsman0.5 m.y Total manpower2.50.53m.y (*) without controls
11
Kicker platform displacement ELENA Meeting 28.09.2011L. Sermeus 10 Resource requirements and what can collaborations contribute to? (the cost and manpower for a new building are not included) Total resource estimate (*) Material and general services306kCHF Manpower estimate (*) CERN ABT staff Collaboration contribution Total resource estimate Scientific staff0.1 m.y Technical assistant0.1 m.y Mechanics technician0.1 m.y (Electro)Mechanic0.3 0.6m.y Electronics technician0.2 m.y FSU(0.3)0.3 m.y Total manpower0.80.61.4m.y (*) without controls
12
Kicker controls ELENA Meeting 28.09.2011L. Sermeus 11 Resource requirements and what can collaborations contribute to? ELENA kickersTotal resource estimate Injection/Extraction200kCHF Fluid systems40kCHF Common controls60kCHF Total for 2 kickers300kCHF Manpower estimateCERN ABT staff Collaboration staffTotal resource estimate Electronics engineer0.5 m.y Electronics technician2.524.5m.y Total manpower325m.y AD kickers displacement/rejuvenationTotal resource estimate Power distribution150kCHF Re-cabling100kCHF PXI control100kCHF Common controls180kCHF Total for 8 kickers530kCHF
13
ELENA Meeting 28.09.2011L. Sermeus 12Conclusion TE/ABT related work and resource needs have been presented. Critical points are still to be clarified: final choice of extraction kicker magnet new location of the kicker platform Reference: CERN-BE-2010-029 OP, November 2010