Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Payload Training. 2 Payload Processes Overview Payload Operations & Integration Function Training Team Payload Training contact –Team LeadLynn Baker(256)

Similar presentations


Presentation on theme: "1 Payload Training. 2 Payload Processes Overview Payload Operations & Integration Function Training Team Payload Training contact –Team LeadLynn Baker(256)"— Presentation transcript:

1 1 Payload Training

2 2 Payload Processes Overview Payload Operations & Integration Function Training Team Payload Training contact –Team LeadLynn Baker(256) 961-1589lynn.baker@tbe.com –NASA POCAlan Johnston(256) 544-4858alan.e.johnston@nasa.gov –PTP ChairTim Horvath(256) 544-3738timothy.j.horvath@nasa.gov Payload Crew Training Team Roles and Responsibilities –During Preparation Phase Plan, develop, and execute ISS crew training, as defined in the NASA Payload Training Implementation Plan (PTIP), with the Payload Developer as an active team member. Conduct the Training Strategy Team (TST) process to define training requirements, trainer hardware/software requirements, and a training schedule. Populate the Training Data Set, if requested by the Payload Developer, and baseline through the NPOCB. Review the Training Development Specification, developed by the Payload Developer, to ensure the trainer hardware/software satisfies the training requirements. Verify the Payload Developer trainer satisfies the requirements defined by the TST utilizing test procedures developed by the Payload Training Team. Provide the Crew Training Instructor, courseware, and lesson plans, if requested by the Payload Developer. Certify the Payload Developer instructor/ and courseware through the execution of a Payload Training Dry Run (PTDR). Schedule and execute crew training. Conduct training logistics, trainer setup, and trainer configuration management. Payload Crew Training Products –Courseware / Lesson PlansI-12 months –Baselined Training Data SetI-12 months –Trained Crew MemberI-3 months

3 3 Level 1 - POI Overview PD inputProcessPayload Integration product/outputISS/SSP program product Legend: I-20 I-9I-19I-14I-12I-18 Payload Planning Payload Training Payload Developer Functions Crew Training Req’ts Trained Crew Trained GSP Configured Ground Systems OOS & Flight Plan Displays & OpNoms Crew Procedures Basic Planning Req’ts Phase II Safety Inputs GSP Training Req’ts Safing/Ground Procedures Basic Ops Constraints Phase III Safety Inputs Ground Systems Final Products Basic Payload Planning Process Console Products TLM and CMD DB Development Update Facilities Configure POIC Training Plans & TrainersCrew Training Courses & Scripts GSP Training & Simulations I-6 Planning Req’ts Final Ops Constraints Final Payload Planning Process Tran- sition Payload Display & Procedures & Displays OpNom OpNom Coordination Display Development ISS Crew Procedures Development Payload Operations Payload Safety Console Products Flight Safety Review Process Ground Safety Review Process Ops Hazard Control Verif Hazardous Cmd Verif Hazmat Validation PSM/Ground Command Procedure Development Flight Rules & PL Regulations Development Integrated Safing Procedures Dev. PHCM PEP/PL MDM Config File Development Bench Review & Waste Process Stowage Req’ts Ground System Req’ts (I-13) GDS Req’ts Display Usability Process Bench Review

4 4 Level 2 - Training: ISS Payload Crew Training Mission Integration PDR/CDR Data Pkgs IDRD Annex 5 CTC TST Reqmts Integration Trainer Dev Payload Trmg Plan (Crew Trng @-a-Glance) MA/ITP Lesson Dev* PTDR. Training Execution Course Ware* Trng Schedules Trained ISS /Shuttle Crew Lesson Dev* Baselined Crew Trmg Dataset Safety Data Package Crew Trng DS Input Trainer Verif Req. Baselined *Instructor task (PD or POI) Trainers Course Ware* Training Scheduling Payload Developer Engineering Integration Payload Operations Integration OBT Dev ISS/Program/ Vehicle PSTP Crew Review Package PTLP* Verified Lesson Certified Instructor Crew Bios Payload Task Assignments CQRM Crew Trng Matrix FURs MPV Training Library OBT Forms Displays Crew Procedures iURC inputs PTLP* Trainer Users Guide PSRD Vol II PLCR PL ICDs

5 5 Requirements Baselining Training Strategy Team (TST) On-Board Training (OBT) Development Lesson Development Trainer Development Payload Training Dry Run (PTDR) Requirements Integration Training Scheduling Training Execution New Payload or Changes to Existing Payload Crew Training Process

6 6 Objectives To introduce the PD to the TST Process, payload training concepts, payload training documentation, and payload training/crew operations processes. To start the PD working on their curriculum and PDL Training Data Set. To define the plan for training the science team.

7 7 TST Roles, Responsibilities, and Products Official Membership of TST: –FD35 Triad Personnel Simulation Engineer (SE) – TST Chair Procedures Representative Displays Representative –PD Representatives –Crew Office Representatives TST Roles: –To aid in the development of payload training requirements for crew –To define a complete payload training/crew operations strategy for each payload TST Responsibilities: –Phase 1 : Determine crew training curriculum development, training tools development, and training readiness planning for the payload –Phase 2: Determine any requirements for Complement Training

8 8 TST Roles, Responsibilities, and Products Phase I TST Products: –Training Assessment Form –Level 5 Schedule Inputs –OBT Decision –PDL Training Data Set –Payload Lesson Change Request (PLCR) –Results of the Usability Verification Assessment Other Training Products: (items developed prior to crew training, but not required for TST closure) –Trainer Development Specification (PD) –Lesson Plans (PL Instructor) –Courseware (PL Instructor) –PL Simulator Test Procedures (SE)

9 9 Payload Training Documentation Payload Training Implementation Plan (PTIP) –SSP 58309 (currently Rev. C, June 2003) –The PTIP details payload training requirements and processes for U.S. PDs. Generic Payload Simulator Requirements Document (PSRD), Vol. 1 –SSP 58026-01 (currently Issue B, June 2001) –The PSRD, Vol. 1, provides the requirements for a Payload Training Unit (PTU) and includes specific functional and interface requirements for the hardware and software mockups that comprise the PTU.

10 10 Crew Payload Training Curriculum, Types, and Phases Crew Payload Training Types: –Payload Nominal Operations Training Payload Introduction (with hardware) Hands-On Nominal Operations Payload Maintenance Expected Malfunctions –Payload Proficiency Training Proficiency Building Proficiency Maintenance –Payload Refresher Training –Payload Transport/Transfer –Payload Complement Training –Joint Multisegment Training (JMST)

11 11 Crew Payload Training Curriculum, Types, and Phases Crew Payload Training Phases: –Advanced-Training on facilities/payloads and support equipment which are permanently resident on-board the ISS –Increment Specific - Emphasizes payload operations which are unique to the upcoming increment –On-Board - includes training which takes place while the crew is resident on-board the ISS

12 12 Human Research Events Coordinated by Training Human Research Multilateral Review Board (HRMRB) Informed Consent Briefing –Includes both briefing and Layman’s Summary of Payload –Must be signed by crew prior to initial training session Test Readiness Review –Must be conducted prior to any crew interface with hardware (including PTDR) –Test Plan includes: Test Summary Institutional Review Board Approval Test Personnel Hazard Analysis Report Subject Informed Consent Package Medical Monitoring Test Procedures Test Termination Criteria

13 13 PDL and Payload Training Data Set Training Data Set –Online, integrated, payload data information system –Used for collection, processing, management, and distribution of payload data –Contains data on: Point of Contact General Information Training Unit Identification Lessons GSP Training Trainer/Simulator requirements –Once data is entered, printing the training data set for a payload generates the data pages that are submitted to the PTP with the PLCR signature page SE Will Enter Data

14 14 Crew Training Development Plan Facility Class Payload Crew Training I-36/20I-20I-19I-18I-17 PD Science Selected Conduct PDR/CDR Participate in TST Populate Crew Training Dataset Crew Training Starts for reflight payloads SE delivers Trainer Test Procedures for New Facility Class Payloads Conduct Preship Test Conduct Training Strategy Team TIMs/Develop Crew Training Requirements Review PDR/IDR Data for Trainer Specs *PDs generally start at I-36 or I-24 months Legend PD Responsibility Payload Training Team Responsibility Joint PD/Trng Team Responsibility Legend: Deliver Procedures and Ref Data TFI integrates Training Requirements Delivers Payload Training Input to MITP Conduct TRR I-16I-15I-14 PD Science Selected Conduct PDR/CDR Participate in TST Populate Crew Training Dataset Deliver Procedures and Ref Data Crew Training Integration/ Implementation TFI collects payload training requirements Develop Crew Task Assignment Conduct Training Strategy Team TIMs/Develop Crew Training Requirements Review PDR/IDR Data for Trainer Specs Subrack Payload Crew Training

15 15 Crew Training Development Plan I-13I-12 I-11 I-10 I-9 Deliver new Facility Class payload trainers to PTC I-8I-7I-6 SE delivers Trainer Test Procedures forNew Subrack Payloads Conduct Preship Test SE delivers PSRD Vol 2 for new Facility class Integrated Trainers Conduct PSIIC Participate In Payload Training Dry Run Crew Training Starts for new Facility class payloads Crew Training ends for new Facility class payloads Conduct Integrated Trainer Acceptance Test Instructor (PD or SE) Deliver lesson plan (PTDR-2 weeks) Finalize OCBT Objectives OCBT Pre- PTDR I-5I-4 OCBT-PTDR Deliver OCBT To Payload OBTWG Rep Deliver new subrack payload trainers to PTC SE delivers PSRD Vol 2 for new subrack Integrated Trainers Conduct PSIIC Participate In Payload Training Dry Run Crew Training ends for new Subrack payloads Crew Training Starts for new subrack payloads Conduct Integrated Trainer Acceptance Test Instructor (PD or SE) Deliver lesson plan (PTDR-2 weeks) Finalize OCBT Objectives OCBT Pre- PTDR OCBT-PTDR Deliver OCBT To Payload OBTWG Rep Deliver OCBT To COSSWG Payload Complement Trng begins Conduct Payload Complement PTDR Payload Training ends Crew Training Starts for new subrack payloads Develop Crew Training Matrix

16 16 Training Development Milestones TIM 1-2Date Payload Overview Training Assessment Form Curriculum Development TIM 1-3Date Crew Training Equipment Proposal Supplemental Crew Training Tools Defined PDL Data Set Entered TIM 1-4Date Review of TST Products TSTDate PTDRDate Ready for TrainingDate LaunchDate


Download ppt "1 Payload Training. 2 Payload Processes Overview Payload Operations & Integration Function Training Team Payload Training contact –Team LeadLynn Baker(256)"

Similar presentations


Ads by Google