Presentation is loading. Please wait.

Presentation is loading. Please wait.

28 Jan, 2015 IFIC (CSIC – Universidad de Valencia) CLB: Current status and development.

Similar presentations


Presentation on theme: "28 Jan, 2015 IFIC (CSIC – Universidad de Valencia) CLB: Current status and development."— Presentation transcript:

1 28 Jan, 2015 IFIC (CSIC – Universidad de Valencia) CLB: Current status and development

2 l 2 CLB FW Back to business last week after our Xmas holidays Bug found in Hydro St. Machine The DOM status was written wrongly in AES header AES word was not properly updated between a couple of states Problem solved

3 l 3 On Shore Station Plans for near future Modify RTU / FD Filtering, VLANs Allow sending packets to specific ports Try to use the greater number of ports Avoid broadcast/multicast packets in WRS (network meltdown)


Download ppt "28 Jan, 2015 IFIC (CSIC – Universidad de Valencia) CLB: Current status and development."

Similar presentations


Ads by Google