Presentation is loading. Please wait.

Presentation is loading. Please wait.

CLIMATE CHANGE In the California Water Plan Update 2013.

Similar presentations


Presentation on theme: "CLIMATE CHANGE In the California Water Plan Update 2013."— Presentation transcript:

1 CLIMATE CHANGE In the California Water Plan Update 2013

2 Project Manager: Elissa Lynn, elynn@water.ca.govelynn@water.ca.gov Project Status: Initiating Charter, Scope, PMP Vetting through CWP Work Teams, DWR Climate Change Team Future Steps: Sponsor Approval, Presentation to Advisory Committee CC- CWP Incorporation

3 CWP 2009 Climate Change Global Circulation Models Downscaled Local Weather Irrigation Demand and Hydrologic Flows

4 REGIONAL Reports Climate Change Scientist in each region Regionally-appropriate Adaptation Strategies Scientifically sound approach to address CC CWP 2013 Climate Change

5 STATEWIDE Strategies Statewide Adaptation Strategies Throughout CWP Update 2013 Key Recommendations, Highlights, Executive Summary CWP 2013 Climate Change

6 TECHNICAL Support Selection of Climate Change Scenarios SWAN – Statewide Water Analysis Network ? CCTAG – Climate Change Technical Adv. Group Synopses of and Access to: National Research Council Sea Level Rise Study DWR Guidance (internal and for IRWM groups) CEC Vulnerability and Adaptation Study Regionally Downscaled Data CWP 2013 Climate Change


Download ppt "CLIMATE CHANGE In the California Water Plan Update 2013."

Similar presentations


Ads by Google